Laserfiche WebLink
Summary of Gauging and Sampling Activities <br /> July 2005 through September 2005 <br /> Former BP Oil 11195 <br /> 16500 South Interstate 5 <br /> Lathrop, CA <br /> Project Coordinator: Shelby Lathrop Water Sampling Contractor: TRC <br /> Telephone: 916-558-7609 Compiled by: Daniel Lee <br /> Date(s) of Gauging/Sampling Event: 08/31/05 <br /> Sample Points <br /> Groundwater wells: 8 onsite, 16 offsite Wells gauged: 21 Wells sampled: 21 <br /> Purging method: Diaphragm pump/bailer <br /> Purge water disposal: Onyx/Rodeo Unit 100 <br /> Other Sample Points: 0 Type: n/a <br /> Liquid Phase Hydrocarbons LPH <br /> Wells with LPH: 0 Maximum thickness (feet): n/a <br /> LPH removal frequency: n/a Method: n/a <br /> Treatment or disposal of water/LPH: n/a <br /> H dro Bolo is Parameters <br /> Depth to groundwater (below TOC): Minimum: 7.54 feet Maximum: 12.09 feet <br /> Average groundwater elevation (relative to available local datum): 3.60 feet <br /> Average change in groundwater elevation since previous event: n/a <br /> .� <br /> Interpreted groundwater gradient and flow direction: <br /> Current event: *see notes <br /> Previous event: 0.02 ft/ft, southwest (05/25/05) <br /> Selected Laboratory Results <br /> Wells with detected Benzene: 0 Wells above MCL (1.0 pg/1): n/a <br /> Maximum reported benzene concentration: n/a <br /> Wells with TPPH 8260B 5 Maximum: 120 pg/l (MW-3) <br /> Wells with MTBE 16 Maximum: 69 pg/l (MW-8) <br /> Notes: <br /> *Groudwater gradient is variable. <br /> CC-WS=Car over well, MW-14=Well damaged, MW-21=Paved over, <br /> This report presents the results of groundwater monitoring and sampling activities performed by TRC. Please contact the <br /> �' primary consultant for other specific information on this site. <br />