Laserfiche WebLink
AWilk <br /> S E C O R <br /> Er'=` 76 Station 11195 <br /> September 13, 2004 <br /> Page 6 <br /> provided to the SJCEHD within six to eight weeks of the completion of all field work and the <br /> receipt of analytical laboratory data. <br /> If there are any questions regarding this work plan, please call us at (916) 861-0400. <br /> Sincerely, <br /> SECOR International Incorporated <br /> 3644A5 �QROFESS/oL <br /> Clinton Harms <br /> Associate Scientist <br /> cc NO.C 058399 rn <br /> Vusty Benkos y, P.E. �T9�QFC Lyiu���P <br /> Senior Engin er <br /> Attachments: <br /> Figure 1 - Site Map with Proposed Soil Boring Locations <br /> Attachment 1 — Field and Laboratory Procedures <br /> cc: Mr. Ed Ralston, ConocoPhillips <br /> Mr. James Barton, RWQCB <br /> CP 11195 Assessrnenl WP 9-04.doc SECOR International Incorporated <br />