Laserfiche WebLink
AM <br /> s E c o R <br /> STANDARD PROCEDURE FOR SOIL SAMPLING <br /> SPLIT SPOON SAMPLING <br /> The precleaned split spoon sampler lined with three 6-inch long brass or stainless steel <br /> tubes is driven 18 inches into the underlying soils at the desired sample depth interval. The <br /> sampler is driven by repeatedly dropping a 140-pound hammer a free fall distance of 30 <br /> inches. The number of blows (blow count) to advance the sampler for each six-inch drive <br /> length are recorded on the field logs. Once the sampler is driven the full 18-inch drive <br /> length or the sampler has met refusal (typically 50 blows per six inches), the sampler is <br /> retrieved. <br /> Of the three sample tubes, the bottom sample is generally selected for laboratory analysis. <br /> The sample is carefully packaged for chemical analysis by capping each end of the sample <br /> with a Teflon sheet followed by a tight-fitting plastic cap and sealing the cap with non-VOC, <br /> self-adhering silicon tape. A label is affixed to the sample indicating the sample <br /> identification number, borehole number, sampling depth, sample collection date and time, <br /> the sampler's name, job number, etc. The sample is then annotated on a chain-of-custody <br /> form and placed in an ice-filled cooler for transport to the laboratory. <br /> The remaining soil samples are used for soil classification and field evaluation of <br /> headspace volatile organic vapors, where applicable, using a photoionization or flame <br /> 4rr � ionization detector calibrated to a calibration gas (typically isobutylene or hexane). VOC <br /> vapor concentrations are recorded on the boring logs. A physical description of the <br /> encountered soil characteristics (i.e. moisture content, consistency, odor, color, etc.) and <br /> soil type as a function of depth are indicated on the boring logs. In addition, the sample <br /> recovery and sampler penetration are also noted on the boring logs. The sampled soils are <br /> classified in accordance with the USCS. <br /> Related Procedures: <br /> Standard Procedure for Equipment Decontamination <br /> STANDARD PROCEDURE FOR <br /> EQUIPMENT DECONTAMINATION <br /> All equipment that could potentially contact subsurface media and compromise the integrity <br /> of the samples is carefully decontaminated prior to drilling and sampling. Drill augers and <br /> other large pieces of equipment are decontaminated using high pressure hot water spray. <br /> Samplers, groundwater pumps, liners and other equipment are decontaminated in an <br /> Alconox scrub solution and double rinsed in clean tap water rinse followed by a final <br /> distilled water rinse. <br />