My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_XR0011445
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
H
>
HARLAN
>
16500
>
3500 - Local Oversight Program
>
PR0545275
>
ARCHIVED REPORTS_XR0011445
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/3/2020 3:54:59 PM
Creation date
2/3/2020 12:40:27 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0011445
RECORD_ID
PR0545275
PE
3528
FACILITY_ID
FA0005678
FACILITY_NAME
LATHROP SHELL
STREET_NUMBER
16500
Direction
S
STREET_NAME
HARLAN
STREET_TYPE
RD
City
LATHROP
Zip
95330
CURRENT_STATUS
02
SITE_LOCATION
16500 S HARLAN RD
P_LOCATION
07
P_DISTRICT
003
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
180
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
S E C O R <br /> CONCLUSIONS AND RECOMMENDATIONS <br /> SECOR will continue to evaluate dissolved concentrations, and operate and perform <br /> monthly maintenance of the OS system at the site. During the second quarter 2005, <br /> SECOR will coordinate and schedule off-site assessment activities to delineate the <br /> extent of dissolved impacts south to southeast of the site. SECOR will submit the results <br /> of off-site assessment activities in a Site Conceptual Model as requested by the <br /> SJCEHD in correspondence dated September 28, 2004. <br /> THIS QUARTER ACTIVITIES (First Quarter 2005) <br /> 1. SECOR prepared and submitted the Quarterly Summary Report— Fourth Quarter <br /> 2004 on January 31, 2005. <br /> 2. Groundwater monitoring and sampling activities were performed by TRC. <br /> 3. TRC uncovered, monitored and sampled well MW-21. <br /> 4. SECOR continued operation, and performed monthly maintenance of the OS <br /> system. <br /> 5. SECOR obtained an encroachment permit in February 2005 for the installation of <br /> one off-site well in the City of Lathrop right-of-way as proposed in SECOR's <br /> September 13, 2004 Work Plan for Additional Site Assessment. <br /> NEXT QUARTER ACTIVITIES (Second Quarter 2005) <br /> 1. Groundwater monitoring and sampling event will be performed by TRC. <br /> 2. Well MW-14 will be repaired. <br /> 3. SECOR will continue operation and perform monthly maintenance of the OS s <br /> system. <br /> 4. SECOR will submit a permit application package to the SJCEHD, coordinate, and <br /> schedule off-site assessment activities that will be completed in accordance with <br /> the September 13, 2004 Work Plan for Additional Site Assessment. Upon <br /> securing the access agreements, SECOR will install off-site well MW-22 on the <br /> Holiday Inn Express property and off-site well MW-24 on the Lathrop Business <br /> Park Property. Well MW-23 will be installed in the City of Lathrop right-of-way <br /> (Harlan Road). <br /> 1 <br /> 1AConocoPhillips\Retail Sites1111951QSR&QRPS 2005/11195 QSR&QRPS 1005.doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.