Laserfiche WebLink
N <br /> MW-7 <br /> INACCESSIBLE <br /> 0 20 40 <br /> SCALE IN FEET <br /> LOUISE AVENUE <br /> W-4' <br /> x(6.53) MW-3 <br /> 6.51 PLANTER <br /> UNDERGROUND--- <br /> NDERGROUND <br /> FUEL TANKS ( I 1 <br /> 6 5� <br /> MW-6 <br /> /USNDEROGIRO <br /> MW-5 �� (6.44) <br /> (6.51) r rolb �MW-2 <br /> UND (6.44) <br /> ED L TANK <br /> I` 0001 <br /> SERVICE <br /> STATION Q <br /> BUILDING MW-1 DISPENSER <br /> (6.45) ISLANDS <br /> DIRT LOT <br /> ~. q <br /> �Q <br /> LEGEND FIGURE 2 <br /> -0 GROUNDWATER MONITORING WELL POTENTIOMETRIC GROUNDWATER <br /> (6.45) GROUNDWATER ELEVATION IN ELEVATION CONTOUR MAP <br /> FEET ABOVE MEAN SEA LEVEL <br /> i 6.46 GROUNDWATER ELEVATION JUNE 9, 1995 <br /> CONTOUR IN FEET ABOVE <br /> MEAN SEA LEVEL BP OIL SERVICE STATION NO. 11195 g <br /> (CONTOUR INTERVAL-0.02 FOOT) 16500 SOUTH INTERSTATE 1-5 <br /> CALCULATED GROUNDWATER LATHROP, CALIFORNIA <br /> 0.001 GRADIENT DIRECTION AND PROJECT N0. 10-151 <br /> MAGNITUDE IN FOOT PER FOOT <br /> ALISTO ENGINEERING GROUP 3 <br /> ca�\ <br /> WALNUT GREEK, CALIFORNIA n <br />