Laserfiche WebLink
TABU 1-SUMMARY OF RESULTS OF GROUNDWATER SAMPLING <br /> BP OIL COMPANY SERVICE STATION NO.11195 <br /> 16500 SOUTH INTERSTATE 1-5,LATHROP,CALIFORNIA <br /> ALISTO PROJECT NO.10-151 <br /> WELL DATE OF CASING DEPTH TO GROUNDWATER TPH-G TPH-D B T E X TOG HVOCs DO LAB <br /> ID SAMPLING/ ELEVATION (a) WATER ELEVATION (b) (ppb) (ppb) (ppb) (ppb) (ppb) (ppb) (ppb) (ppb) (ppm) <br /> MONMORING (Feet) (Feet) (Feet) <br /> MW-1 12/21/92 14-39 11.18 3.21 ND<50 - ND<0.5 ND<0.5 ND<0.5 ND<0.5 - - - PACE <br /> MW-1 05/17/93 14.39 8.41 5.98 ND<50 - ND<0.5 ND<0.5 0.6 2.1 - - - PACE <br /> MW-1 0911SP93 14.39 9.78 4.61 ND<50 - ND<0.5 ND<0.5 ND<0.5 ND<0.5 - - - PACE <br /> MW-1 01/12/94 14,39 10.49 3.90 ND<50 - ND<0.5 ND<0.5 ND<0.5 ND<0.5 - - 3.7 PACE <br /> MW-1 05/12/94 14.39 9.77 4.62 ND<50 - ND<0.5 ND<0.5 ND<0.5 ND<0.5 - - 4.0 PACE <br /> MW-1 10/07/94 14.39 10.54 385 ND<50 - ND<0.5 ND<0.5 ND<0.5 ND<0.5 - - 3.9 PACE <br /> MW-1 12108x94 14.39 10.75 3.64 1300 - 0.8 2.4 ND<0.5 ND<0.5 - - 4.1 PACE <br /> MW-2 12121/92 14.20 10.96 3.24 ND<50 - ND<0.5 ND<0.5 ND<0.5 ND<0-5 - - - PACE <br /> MW-2 05/17/93 1420 8.20 6.00 120 - 1.8 0.6 12 1 - - - PACE <br /> MW-2 09/15/93 1420 9.58 4.62 2800 - 97 NDQ.5 290 250 - - - PACE <br /> MW-2 01/12/94 1420 10.28 3.92 51 - ND<0.5 ND<0.5 ND<0.5 ND<0.5 - - 4.3 PACE <br /> MW-2 05112/94 1420 9.57 4.63 64 - ND<0.5 ND<0.5 ND<0.5 ND<0.5 - - 3.9 PACE <br /> MW-2 10/07/94 14.20 10.36 3.84 86 - ND<0.5 ND<0.5 ND<0.5 ND<0.5 - --- 4.0 PACE <br /> MW-2 12/08/94 1420 10.53 3.67 2300 - ND<0.5 ND<0.5 ND<0.5 ND<0.5 - - 4.0 PACE <br /> MW-3 12/21/92 15.10 11.84 3.26 1300 - 6.7 3.1 9.1 310 - - - PACE <br /> MW-3 05/17/93 15.10 9.05 6,05 3600 - 20 9.3 470 700 - - - PACE <br /> QC-1 (c) 05/17/93 - --- -- 4000 - 23 12 520 810 - - - PACE <br /> MW-3 09/15093 15.10 10.44 4.66 38000 - 770 34 1700 3300 - - -- PACE <br /> MW-3 01/12/94 15.10 11.15 3.95 380 --- ND<0.5 ND<0.5 ND<0.5 ND<0.5 - - 5.3 PACE <br /> QC-1 (c) 01/12/94 15.10 - - 400 - ND<0.5 ND<0.5 ND<0.5 NM-5 - - - PACE <br /> MW-3 05/12/94 15.10 10.45 4.65 180 - 0.7 ND<0.5 4.3 4.2 - - 4.4 PACE <br /> OC-1 (c) 05/12/94 15.10 - - 170 - 0.7 ND<0.5 3.8 3.9 - - - PACE <br /> MW-3 10/17/94 15.10 11.21 3.89 120 - ND<0.5 ND<0.5 N1<0.5 ND<0.5 - - 4.3 PACE <br /> QC-1 (c) 10/07/94 15.10 - - ND<50 - 0.7 ND<0.5 ND<0.5 ND<0.5 - - - PACE <br /> MW-3 12/08/94 15.10 11.40 3.70 470 - 1.1 1.8 ND<0.5 9.0 - - 4.8 PACE <br /> QC-1 (c) 12108+94 15.10 -- - 460 - 0.7 1.1 ND<0.5 5.9 - - - PACE <br /> MW-4 12121/92 14.32 11.06 3.26 10000 ND-5 ND<2.5 3.5 300 540 ND<50 ND (d) - PACE <br /> MW-4 05/17/93 14.32 8.25 6.07 6600 - 7.7 3.3 840 1000 - - - PACE <br /> MW4 09/15/93 14.32 9.64 4.68 16000 - ND<12 NO<12 1000 1300 - - - PACE <br /> QC-1 (c) 09/1553 - - - 16000 - 18 ND<12 1000 1200 - - - PACE <br /> MW-4 01/12/94 14.32 10.38 3.94 3200 - 6.2 1.4 150 112 - - 4.8 PACE <br /> MW-4 05!12(94 14.32 9.70 4.62 160 --- ND<0.5 2.5 0.7 ND<0.5 - - 5.0 PACE <br /> MW-4 10/07/94 14.32 10.46 3.86 13000 - 11 2.1 1100 33 - - 4.8 PACE <br /> MW-4 12/)8/94 14.32 10.62 3.70 5400 - 20 27 490 54 - - 5.3 PACE <br /> MW-5 12121/92 16.00 12.74 326 ND<50 - ND<0.5 ND<0.5 ND<0.5 ND<0.5 - - - PACE <br /> MW-5 05/17/93 16.00 9.94 6.06 ND<50 110 ND<0.5 ND<0.5 ND<0.5 ND<1.0 ND<5.0 ND (d) --- PACE <br /> MW-5 09/15193 16.00 11.31 4-69 ND<50 ND<50 ND<0.5 ND<0.5 ND<0.5 ND<0.5 - - PACE <br /> MW-5 01/12/94 16.00 12.07 3-93 ND<50 80 ND<0.5 ND<0.5 ND<0.5 ND<0.5 ND<1 0 ND (d) 4.5 PACE <br /> MW-5 05/12/94 16.00 11.36 4.64 ND<50 80 ND<0.5 ND<0.5 ND<0.5 ND<0-5 ND<5000 ND (d) 4.5 PACE <br /> MW-5 10/07/94 16.00 12.15 3.85 ND<50 260 ND<D.5 ND<0.5 ND<0-5 ND<0.5 ND<5000 ND (d) 4.4 PACE <br /> MW-5 12/08194 16.00 12.32 3.68 ND<50 250 ND<0.5 ND<0.5 ND<0.5 ND<0.5 ND<5000 ND (d) 4.5 PACE <br /> 09-Mer-95 <br /> PAGE <br />