Laserfiche WebLink
N <br /> Mw-7 <br /> INACCESSIBLE <br /> U 20 40 <br /> SCALE IN FEET <br /> LOUISE AVENUE <br /> w-4 <br /> (3).70) <br /> PLANTER ` <br /> UNDERGROUND/ <br /> FUEL TANKS JJ <br /> Mw-6 <br /> r MW-3 (3.68) <br /> r (3.70) <br /> cr3 MW-5 40— <br /> {3.68) l e=2 3.68 <br /> Q o p DISPENSER MW-2 <br /> UNDERGROUND j c7 ISLANDS (3.67) <br /> USED OIL TANK m ,3.66 0 1 <br /> MW-1 <br /> (3.64) pQ <br /> DIRT LOT <br /> �s <br /> z� <br /> LEGEND FIGURE 2 <br /> -0 GROUNDWATER MONITORING WELL <br /> (3.70) GROUNDWATER ELEVATION IN POTENTiOMETRIC GROUNDWATER <br /> FEET ABOVE MEAN SEA LEVEL ELEVATION CONTOUR MAP <br /> i 3.70 — GROUNDWATER ELEVATION DECEMBER S, 1994 <br /> CONTOUR IN FEET ABOVE <br /> MEAN SEA LEVEL BP OIL SERVICE STATION NO. 11195 <br /> CONTOUR INTERVAL-0.02 FOOT) 18500 SOUTH INTERSTATE I-5 s <br /> CALCULATED GROUNDWATER iATHROP, CALIFORNIA <br /> 0.001 GRADIENT DIRECTION AND <br /> MAGNITUDE IN FOOT PER FOOT PROJECT NO. 10-151 <br /> q <br /> ^�ALISTO ENGINEERING GROUP A <br /> /�` WALNUT CREEK, CALIFORMA v <br />