Laserfiche WebLink
Gettler-Ryan, Inc. Log of Boring SP-6 <br /> -` ' PROJECT: Tosco (76) Service Station No. 11195 LOCATION: 16500 South Interstate 5, Lathrop, CA <br /> GR PROJECT NO. : 140193.14 CASING ELEVATION: <br /> DATE STARTED: 12/12/02 WL (ft. bgs): DATE: TIME: <br /> DATE FINISHED: 12/12/02 WL (ft. bgs): DATE: TIME: <br /> DRILLING METHOD: 8 in. Hollow Stem Alger TOTAL DEPTH: 32 feet <br /> DRILLING COMPANY: Cascade Drilling GEOLOGIST: Jeremy Smith <br /> LD U) WELL DIAGRAM <br /> U J GEOLOGIC DESCRIPTION <br /> w re o <br /> Asphalt and base rock - 6 inches thick. <br /> ro <br /> 5M SILTY SAND (SM) - brown (2.SY 4/4), moist. <br /> n o <br /> U <br /> 5 Not logged or sampled. <br /> 1a <br /> CO <br /> a <br /> ur <br /> 1b <br /> m <br /> U <br /> u <br /> 15 ro <br /> r <br /> ro <br /> a <br /> 20- <br /> 25— <br /> q] <br /> 0 <br /> 77 7 <br /> - - <br /> Q : <br /> 30 <br /> ro <br /> ' Bottom of boring at 32 feet bgs. <br /> " <br /> ._ m <br /> C. <br /> o <br /> 35 <br /> JOB NUMBER: 140193.14 Page 1 of 1 <br />