My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_XR0011642
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
H
>
HARLAN
>
16500
>
3500 - Local Oversight Program
>
PR0545275
>
ARCHIVED REPORTS_XR0011642
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/3/2020 3:18:35 PM
Creation date
2/3/2020 1:06:03 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0011642
RECORD_ID
PR0545275
PE
3528
FACILITY_ID
FA0005678
FACILITY_NAME
LATHROP SHELL
STREET_NUMBER
16500
Direction
S
STREET_NAME
HARLAN
STREET_TYPE
RD
City
LATHROP
Zip
95330
CURRENT_STATUS
02
SITE_LOCATION
16500 S HARLAN RD
P_LOCATION
07
P_DISTRICT
003
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
17
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
WORK PLAN FOR ADDITIONAL GROUNDWATER DELINEATION <br /> AND OZONE MICROSPARGE SYSTEM INSTALLATION <br /> at <br /> Tosco(Former BP)Service Station No. 11195 <br /> 16500 South Interstate-5 <br /> Lathrop,California <br /> Report No. 140193.14-1 <br /> INTRODUCTION <br /> At the request of Tosco Corporation (Tosco), a subsidiary of ConocoPhillips, Gettler-Ryan Inc. <br /> (GR) has prepared this Work Plan for the installation of three offsite groundwater monitoring wells <br /> to further evaluate groundwater conditions downgradient of the subject site. This work was <br /> recommended in GR's report number 140193.12-2, Monitoring Well Installation Report, dated <br /> July 24, 2002. This Work Plan also describes the proposed installation of an ozone microsparge <br /> r system and ozone sparge points as an interim remedial action, as recommended in GR's report <br /> number 140193.13,Interim Corrective Action Plan, dated August 28, 2002. The proposed scope <br /> of work includes: updating the site safety plan; obtaining the required well and sparge point <br /> installation permits; installing three offsite groundwater monitoring wells; installing onsite ozone <br /> sparge points; installing an ozone microsparge system; surveying monitoring wellhead elevations; <br /> developing and sampling the wells; collecting and submitting selected soil samples for chemical <br /> analysis; arranging for Tosco's contractor to dispose of the waste materials and preparing a report <br /> presenting the observations associated with the well installation and the sparge system startup. <br /> The scope of work proposed in this work plan is intended to comply with the State of California <br /> Water Resources Control Board's Leaking Underground Fuel Tanks (LUFT) Manual and <br /> California Underground Storage Tank Regulations, 1994, the Regional Water Quality Control <br /> Board (RWQCB) Tri-Regional Board Staff Recommendations for Preliminary Investigation <br /> and Evaluation of Underground Tank Sites, and the San Joaquin County Public Health <br /> Services—Environmental Health Division(EHD) guidelines. <br /> I <br /> - I <br />
The URL can be used to link to this page
Your browser does not support the video tag.