My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_XR0011644
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
H
>
HARLAN
>
16500
>
3500 - Local Oversight Program
>
PR0545275
>
ARCHIVED REPORTS_XR0011644
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/3/2020 3:16:25 PM
Creation date
2/3/2020 1:07:36 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0011644
RECORD_ID
PR0545275
PE
3528
FACILITY_ID
FA0005678
FACILITY_NAME
LATHROP SHELL
STREET_NUMBER
16500
Direction
S
STREET_NAME
HARLAN
STREET_TYPE
RD
City
LATHROP
Zip
95330
CURRENT_STATUS
02
SITE_LOCATION
16500 S HARLAN RD
P_LOCATION
07
P_DISTRICT
003
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
16
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Work Plan For Limited Subsurface investigation—Tosco(Former BP)Service Station No. 11 195 <br /> October 15,2001 <br /> ethylbenzene, and total xylenes (BTEX) and methyl tertiary butyl ether (MTBE) by EPA Method <br /> 8020. In addition, the groundwater samples will be analyzed for fuel oxygenates by EPA Method <br /> 8260. <br /> Task 5. Reporting <br /> Following receipt and analysis of all data, a report will be prepared which.summarizes the procedures <br /> and the findings associated with this investigation. This report will be submitted to Tosco for their <br /> use and distribution. <br /> PROJECT STAFF <br /> Mr. Douglas J. Lee, Project Manager (California Registered Geologist No. 6882) will provide technical <br /> oversight and review of the work and will supervise and direct field and office operations. GR employs a staff <br /> of geologist,engineers, and technicians who will assist with the project. <br /> SCHEDULE <br /> Implementation of the proposed scope of work will commence upon receipt of regulatory approval, offsite <br /> access permission and the appropriate permits. <br /> 140193.11-1 <br /> 6 <br />
The URL can be used to link to this page
Your browser does not support the video tag.