My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SITE INFORMATION AND CORRESPONDENCE
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
C
>
CALIFORNIA
>
730
>
2900 - Site Mitigation Program
>
PR0542060
>
SITE INFORMATION AND CORRESPONDENCE
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/3/2020 3:17:14 PM
Creation date
2/3/2020 1:29:19 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
SITE INFORMATION AND CORRESPONDENCE
RECORD_ID
PR0542060
PE
1635
FACILITY_ID
FA0024152
FACILITY_NAME
ISABELLA'S CATERING #4ED5145
STREET_NUMBER
730
Direction
S
STREET_NAME
CALIFORNIA
STREET_TYPE
ST
City
STOCKTON
Zip
95203
APN
14723003
CURRENT_STATUS
02
SITE_LOCATION
730 S CALIFORNIA ST
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\wng
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SITE MITIGATION PROGRAM CHECKLIST <br /> SITE LOCATION: 'g314 yi <br /> FA#: ©�Zy j'2 PR# 5+-t <br /> DATE ACTIVITY INITIAL <br /> t� Review submittal and make sure all documents/fees have been submitted. L_ X <br /> Z Request documents/fees not submitted. <br /> Provide MFR to Accounting to ensure project has a FA#and a PR#. The PR#for a <br /> �I(Z project does not change. If the lead agency changes, a new PR#must be created under L �' <br /> the existing FA. <br /> Issue SR for Work Plan Review— Enter the data into the SR form in EC making sure <br /> to link the SR to the related FA. Generate an SR#and document on the permit form. If <br /> �[ no permit form has been submitted, record the information on a golden rod Service , <br /> Request form. Use this SR#on your DAR to track time spent obtaining documents/ L- <br /> fees, reviewing work plan, issuing permits, coordinating field work activities, reviewing <br /> subsequent report/sample results, making notifications/referrals. <br /> q I Work Plan SR#: <br /> Review Work Plan to ensure scope of work matches the scope of work approved by <br /> the lead agency and that the mw construction/destruction meets SJC Ordinance Code <br /> and well standards. <br /> Issue Permits - Enter permit information into WP form in EC, link to the FA#for the <br /> project, and obtain a WP#. Use this WP#on DAR to track time spent in the field for the �)( <br /> specific mw/boring activity specified on the permit. <br /> WP#: 0_05yoq Scope: 3 �� L, <br /> l WP#: dD 350"1 Scope: art L <br /> WP#: Scope: <br /> WP#: Scope: <br /> WP#: Scope: <br /> After scope of work on the well and boring permit WPs are complete, update the <br /> following fields in the Well Permit Approval Dates section of the WP form in EC: Plan <br /> Status—choose 'Finaled'; Final Inspection —enter date permit finaled. <br /> After all field work is complete, flag calendar to follow up on report of findings. <br /> Report Review: <br /> • Environmental Assessment Projects -Review report to determine if <br /> contamination was found. If contamination present, print out a 5021 and request a <br /> new PR# be issued under PE 2960. Provide 5021 to Accounting Office for <br /> processing. Complete a Prop 65 Notification. Send notification letter to CVRWQCB. <br /> • EHD Lead Oversight Projects -Review report to determine next phase of work to <br /> be conducted or if closure is appropriate. Complete Prop 65 for any new <br /> contaminants found at the site. <br /> • Other Lead Agency Projects -Review report to determine if any immediate public <br /> health issues are found. If public health concerns are found, notify supervisor <br /> immediately for follow up and further notifications. Complete Prop 65 for any new <br /> contaminants found at the site. <br /> After scope of work for the project SR is complete, update the following fields in the <br /> Service Request Approval Dates section of the SR form in EC: Plan Status—choose <br /> 'Finaled'; Final Inspection—enter date work finalized. <br /> EHD-29 8/15/17 Site Mitigation Program Checklist <br />
The URL can be used to link to this page
Your browser does not support the video tag.