Laserfiche WebLink
7.0 REPORTING <br /> Following the completion of the Additional Site Assessment field activities and receipt of the soil <br /> and groundwater laboratory analytical results, a report will be prepared detailing the field <br /> activities, methods and findings in a form reasonably requested by the CVRWQCB and consistent <br /> with the Tank Fund guidelines. <br /> Following completion of the second groundwater monitoring event and receipt of the <br /> groundwater laboratory analytical results, a groundwater monitoring report will be prepared <br /> detailing the field activities, methods and findings. <br /> All work, including report preparation and field activities,will be conducted under the supervision <br /> of a California Professional Geologist (PG). <br /> Additional Site Assessment Work Plan <br /> Heliostockton Property <br /> 434 Dr.Martin Luther King Jr.Boulevard <br /> Stockton,California <br /> Partner Project Number SM17-191672 <br /> RWQCB Case#:392004 <br /> January 9,2018 <br /> Page 15 <br />