Laserfiche WebLink
11. Please include a copy of any studies ( soils, geology, marketing, <br /> etc. ) that you may have had prepared for this project or project <br /> site. NONE <br /> C. PROJECT CHARACTERISTICS <br /> 1. Services: Indicate how the following services will be provided <br /> for your project and availability of service. <br /> a . Water Supply: EXISTING' WEL . <br /> b. Sewage Disposal : SmSrING- SEMC T"AN1� <br /> c. Storm Drainage: NATUKhL_ <br /> If an extension of any of the above is necessary, indicate <br /> which service( s ) , what agency will be providing the <br /> service(s ) , and the distance of the extension( s ) : WO <br /> d. Natural Gas : `(ES <br /> e. Electricity: P.a. E . <br /> f . Road/Access ( i .e . , paved, unpaved, public/private, road name ) : <br /> CAST*LF- RA AD eN U E O ! PUBLIC <br /> g . ' Fire: MANTEch-lMWDistance to nearest fire station: -L Ih1l,ES <br /> h . Schools: Mht4MCh uNiFIED . NEW NRUE:W SCIJOOL AUSTIpJ RaAb <br /> 2 . Describe any site alterations which result from the proposed .pro- <br /> ject ( specifically address the amount and location of grading, <br /> cuts and fills, vegetation removal, alterations to drainage, <br /> removal of existing structures, number of trees removed, etc. ) . <br /> NONE. <br /> 3 . Air Quality Information: <br /> Number and type of vehicles associated with completed project <br /> Nowe <br /> Types of emissions and sources associated with project <br /> N. A . <br /> Fuel sources (and amounts ) to be consumed by or as a result of the <br /> completed project N. A <br /> Will the project result in substantial air emissions or deteriora- <br /> tion of ambient air quality? _XNO YES <br /> 4 . How much agricultural land will be removed from production? <br /> NONE, <br /> Irrigated Not irrigated <br /> Minor Subdivision - 9 - ( 6/86 ) <br />