Laserfiche WebLink
SAN JOAQUIN Environmental Health Department <br /> C-o U N T Y — Jasjit Kang, REHS, Director <br /> Muniappa Naidu,REHS,Assistant Director <br /> PROGRAM COOROINATORS <br /> Robert McClellon,REHS <br /> Jeff Carruasco.REHS,RDI <br /> Wllly Ng•REHS <br /> Melissa N{ssim,REHS <br /> Steven Shlh.REHS <br /> Michelle Henry,REHS <br /> February 25, 2022 <br /> To: San Joaquin County Community Development Department <br /> Attention: Alisa Goulart <br /> From: Naseem Ahmed; (209) 468-3436 <br /> Senior Registered Environmental Health Specialist IVVJ <br /> RE: PA-2000012 (UP), Referral, S00013002 <br /> 20814 N. Davis Rd, Lodi <br /> The following requirements have been identified as pertinent to this project. Other requirements <br /> may also apply. These requirements cannot be modified. <br /> 1. Applicant shall contact Robert McClellan, Program Coordinator, Small Public Water <br /> System Program, at (209) 468-0332, to determine if the existing well can be permitted as <br /> a public water system prior to issuance of building permits. If a public water system is <br /> required, applicant shall submit a Small Public Water System preliminary technical report <br /> to the California State Water Resources Control Board, Division of Drinking Water (Water <br /> Board) at least six months before initiating construction of any water related improvement, <br /> as defined. The issuance of a permit to operate a small public water system by the local <br /> primacy agency (EHD) is prohibited without the concurrence of the Water Board. Please <br /> contact Brian Kidwell, P.E. with the SWRCB Division of Drinking Water at (209) 948-3963 <br /> concerning the requirements for preliminary technical report submittal prior to issuance of <br /> building permits. <br /> If the Water Board determines that an onsite well shall be used as the potable water source, <br /> a permit application to operate Small Public Water System shall be submitted to the EHD <br /> for approval prior to issuance of building permits. To issue a permit to operate, concurrence <br /> from the Water Board is required. A yearly permit to operate a public water system will be <br /> required by the EHD prior to sign off of the certificate of final occupancy (San Joaquin <br /> County Development Title, Section 9-1120.2 and 9-11 15.9.). <br /> The supplier must possess adequate financial, managerial, and technical capability to <br /> assure delivery of pure, wholesome, and potable drinking water in accordance with San <br /> Joaquin County Development Title, Sections 9-1120.2 and 9-1115.9 and C.C.R., Title 22, <br /> and Health and Safety Code, Section 116525 116570- <br /> 2. A soil suitability and nitrate loading study incorporating proposed staff and customer use <br /> shall be submitted to the Environmental Health Department (EHD), indicating that the area <br /> is suitable for septic system usage. The studies must be approved by the EHD prior to <br /> issuance of building permit(s). (San Joaquin County Development Title, Section 9- <br /> 1868 E. Hazelton Avenue I Stockton, California 95205 1 T 209 468-3420 1 F 209 464-0138 1 v .sigov.orglehd <br />