Laserfiche WebLink
The costs associated with off-site landspreading of the soils are <br /> as follows: <br /> Excavation $ 40, 000 <br /> Site Restoration 80, 000 <br /> Off-site Landspreading <br /> (incl. trans. ) 620, 000 <br /> Sampling 20, 000 <br /> Misc. (Equip. , Manpower, etc. ) 30, 000 <br /> $786, 000 <br /> Contingency (20%) 157. 000 <br /> Total Estimate $943, 200 <br /> 7.2 . 2 . Thermal Treatment <br /> The majority of petroleum products available today are used for <br /> energy. Their unique chemical properties allow consideration of <br /> incineration processes for remedial activity. the process of <br /> incineration invoices the combustion of these organic compounds <br /> in the presence of oxygen. <br /> There are may types of solids-processing incinerator currently <br /> available for use. Waste materials are incinerated in rotating <br /> kilns, fixed kilns or hearths, rotating lime or cement kilns, <br /> asphalt plants, fluidized bed incinerations, and low temperature <br /> strippers. <br /> Of the types of incinerators discussed, rotating kiln and fluid- <br /> ized bed are available as transportable units for on-site soils <br /> processing and as large-scale commercial facilities. The low <br /> temperature thermal stripper is specifically designed as a <br /> transportable unit. Transportable units are usually delivered on <br /> flat-bed trailers in modules which are quickly united and in- <br /> stalled. Usually only hood-ups for utilizes are required. <br /> Sate-specific regulatory, technical, and economic factors will <br /> determine the choice of on- or off-site processing. <br /> For the purposes of this report, a general estimate is provided <br /> for on-site thermal treatment. Typically, costs are dependent <br /> upon the type of incineration process selected. The estimated <br /> costs associated with this remedial alternative areas are as <br /> follows: <br /> o On-sate Mobile Unit <br /> ($200/ton) (8000 yd3 x 2600lb/yd3) $2, 080, 000 <br /> o Permits and Manpower 320, 000 <br /> o Excavation, Backfill & Resurface 120, 000 <br /> $2 , 520,000 <br /> Contingency (20%) 504 , 000 <br /> Total Estimate $3 , 024 , 000 <br /> - 16 - <br />