My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
I
>
INDUSTRIAL
>
230
>
2900 - Site Mitigation Program
>
PR0009051
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/5/2020 9:19:12 AM
Creation date
2/5/2020 8:41:46 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
WORK PLANS
RECORD_ID
PR0009051
PE
2960
FACILITY_ID
FA0000649
FACILITY_NAME
FORMER NESTLE USA INC FACILITY
STREET_NUMBER
230
STREET_NAME
INDUSTRIAL
STREET_TYPE
DR
City
RIPON
Zip
95366
APN
25938001
CURRENT_STATUS
01
SITE_LOCATION
230 INDUSTRIAL DR
P_LOCATION
05
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\wng
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
52
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
2012 Monitoring Well Installation Work Plan <br /> Former Nest1E USA, Inc. Facility November 8, 2012 <br /> TABLE OF CONTENTS <br /> Acronymsand Abbreviations....................................................................................................... Iii <br /> 1 Introduction............................................................................................................................1 <br /> 2 Monitoring Well Placement and Design.................................................................................1 <br /> 2.1 Location..........................................................................................................................1 <br /> 2.2 Screen Intervals..............................................................................................................1 <br /> 3 Monitoring Well Installation Plan............................................................................................2 <br /> 3.1 Permits and Drilling ........................................................................................................2 <br /> 3.2 Well Construction ...........................................................................................................3 <br /> 3.3 Well Development ..........................................................................................................3 <br /> 3.4 Well Location Survey................................................................:.....................................3 <br /> 4 Well Monitoring and Sampling...............................................................................................3 <br /> 5 Implementation Schedule......................................................................................................4 <br /> FIGURE <br /> Figure 1: Proposed Monitoring Well Locations <br /> Page ii <br />
The URL can be used to link to this page
Your browser does not support the video tag.