Laserfiche WebLink
8 . If the project will use significant amounts of any of the <br /> following, estimate amount or note that a large amount will be <br /> consumed: <br /> a . water NA C. natural gas NA <br /> b. electricity NA <br /> 9 . Describe any discharges into surface waters ( including intermit- <br /> tant streams ) NA <br /> 10 . Will the project result in substantial air emissions or <br /> deterioration of ambient air quality? X NO YES <br /> 11. Will there be objectionable odors? X NO YES <br /> 12. Describe any alteration of air movements, moisture, or tem- <br /> perature, or any change in climate, either locally or <br /> regionally NA <br /> 13 . Specify any hazardous materials which will require storage, <br /> disposal, or transportation NA <br /> 14 . Describe any exposure of people to noise, hazardous materials or <br /> situations NA <br /> 15 . Describe any displacement of people as a result of the project <br /> NA <br /> 16 . Describe any congestion which might occur on roadways or at <br /> interchanges or intersections as a result of the project <br /> NA <br /> B. MITIGATION MEASURES NA <br /> If any enbironmental impacts were described in the previous section, <br /> list and darpcflbe �mea�.vv§, �toposed to minimize, t,h,�.impa,pt.�s . ( tjtach <br /> additional pages, 'if necessary. Use the fol*lowi'lg 'format:j <br /> 1. Impact <br /> Mitigation Measures <br /> -7- (9/85 ) <br /> Plan-44 <br />