Laserfiche WebLink
8 . If the project will use significant amounts of any of the <br /> following, estimate amount or note that a large amount will be <br /> consumed: <br /> a . water Not significant C. natural gas Not significant <br /> b. electricity Not significant <br /> 9 . Describe any discharges into surface waters ( including intermit- <br /> tant streams ) Storm drainage will be charged into the diverting canal. <br /> 10. Will the project result in substantial air emissions or <br /> deterioration of ambient air quality? x NO YES <br /> 11. Will there be objectionable odors? x NO YES <br /> 12. Describe any alteration of air movements, moisture, or tem- <br /> perature, or any change in climate, either locally or <br /> regionally None <br /> 13 . Specify any hazardous materials which will require storage, <br /> disposal, or transportation None <br /> 14. Describe any exposure of people to noise, hazardous materials or <br /> situations None <br /> 15 . Describe any displacement of people as a result of the project <br /> None <br /> 16. Describe any congestion which might occur on roadways or at <br /> interchanges or intersections as a result of the project <br /> Full development of project will add traffic to Wilson Way <br /> B. MITIGATION MEASURES <br /> If any environmental impacts were described in the previous section, <br /> list and describe measures proposed to minimize the impacts . (Attach <br /> additional pages, if necessary. Use the following format. ) <br /> 1. Impact Impacts are all minor <br /> Mitigation Measures <br /> ' F <br /> -7- (9/85 ) <br /> Plan-44 <br />