My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
FIELD DOCUMENTS
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
I
>
INDUSTRIAL
>
230
>
2900 - Site Mitigation Program
>
PR0009051
>
FIELD DOCUMENTS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/5/2020 11:52:16 AM
Creation date
2/5/2020 10:01:55 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
FIELD DOCUMENTS
RECORD_ID
PR0009051
PE
2960
FACILITY_ID
FA0000649
FACILITY_NAME
FORMER NESTLE USA INC FACILITY
STREET_NUMBER
230
STREET_NAME
INDUSTRIAL
STREET_TYPE
DR
City
RIPON
Zip
95366
APN
25938001
CURRENT_STATUS
01
SITE_LOCATION
230 INDUSTRIAL DR
P_LOCATION
05
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\wng
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
448
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
r <br /> `. Geomatrix RECENED <br /> September 19,2005 SEP 2 1 2005 <br /> Project 9837.000 ENVIRONMENT HEALTH <br /> PERMITISERVICES <br /> Mr. Marcus Pierce <br /> California Regional Water Quality Control Board <br /> Central Valley Region <br /> 11020 Sun Center Drive,#200 <br /> Rancho Cordova, California <br /> Subject: Molasses Solution Analytical Results <br /> Former Nestle Facility <br /> Ripon,California <br /> Dear Mr. Pierce: <br /> Attached are the analytical results for the representative molasses solution that will be used as the <br /> injected reactant for further assessment during bioremediation testing at the Former Nestle <br /> Facility in Ripon, California. At your request, a representative sample of the molasses solution <br /> was analyzed for the presence and concentration of dissolved metals consistent with the July 12, <br /> 2005 Final Work Plan for Initial Testing and Characterization Program (Work Plan). The <br /> molasses solution will be injected into existing site monitoring wells during push-pull tests as <br /> described in the Work Plan. The testing will begin at the site beginning September 26,2005. <br /> We appreciate your continued support and assistance with this project. Please contact the <br /> undersigned if you have any questions. Thank you. <br /> Sincerely yours, <br /> GEOMATRIX CONSULTANTS,INC. <br /> Jennifer L. Patterson,PE *DWamer,RG,CEG, CHg <br /> Senior Engineer Principal Hydrogeologist <br /> nr/SDW/Idu <br /> lADoc Safe\9000s\9637\=lasses solution letter.doc <br /> Attachment: Molasses Solution Analytical Results <br /> cc: Michael Desso,Nestle USA,Inc. <br /> Noelia Marti-Colon,Nestle USA,Inc. <br /> Binayak Acharya,Environmental Cost Management <br /> Anna Engh, Covington&Burling <br /> Matt Machado,City of Ripon <br /> Tom Hindman,Ripon Public Library <br /> Mike Owens, Fox River Paper Company <br /> Margaret Lagorio, San Joaquin County Public Health Services <br /> David Kirk,Lawrence&Associates <br /> 2101 Webster Street, 12th Floor Tel 510.663.4100 H,wN,geomatrix.com <br /> Oakland.California 94612-3066 Fax 510.663.4141 <br />
The URL can be used to link to this page
Your browser does not support the video tag.