Laserfiche WebLink
Responses to comments from CRWQCB-CVR on SVE Decommissioning Workplan <br /> Former NestI6 Facility,Ripon,California <br /> General Comments <br /> 1. A contingency plan for additional soil vapor sampling was added. See third paragraph of Section 3.1 in <br /> September 1,2000 revised workplan <br /> Specific Comments <br /> 1. A table summarizing operating data was added. See Table 1 in revised workplan dated September 1,2000. <br /> 2. The system was not operated in 1999 except on January 26, 1999. See second paragraph of Section 2.0 in <br /> revised workplan dated September 1,2000. <br /> 3. Six liter Summa®canisters will be used rather than Tedlar®bags. See first paragraph of Section 3.2 in revised <br /> workplan dated September 1,2000. <br /> 4. EPA Method TO-14 will be used. See third paragraph of Section 3.2 in revised workplan dated September 1, <br /> 2000. <br /> 5. Monitoring point OB-1 was added to Figure 2. See Figure 2 in revised workplan dated September 1,2000. <br />