My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
FIELD DOCUMENTS
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
I
>
INDUSTRIAL
>
230
>
2900 - Site Mitigation Program
>
PR0009051
>
FIELD DOCUMENTS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/5/2020 11:52:16 AM
Creation date
2/5/2020 10:01:55 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
FIELD DOCUMENTS
RECORD_ID
PR0009051
PE
2960
FACILITY_ID
FA0000649
FACILITY_NAME
FORMER NESTLE USA INC FACILITY
STREET_NUMBER
230
STREET_NAME
INDUSTRIAL
STREET_TYPE
DR
City
RIPON
Zip
95366
APN
25938001
CURRENT_STATUS
01
SITE_LOCATION
230 INDUSTRIAL DR
P_LOCATION
05
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\wng
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
448
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Responses to comments from CRWQCB-CVR on SVE Decommissioning Workplan <br /> Former NestI6 Facility,Ripon,California <br /> General Comments <br /> 1. A contingency plan for additional soil vapor sampling was added. See third paragraph of Section 3.1 in <br /> September 1,2000 revised workplan <br /> Specific Comments <br /> 1. A table summarizing operating data was added. See Table 1 in revised workplan dated September 1,2000. <br /> 2. The system was not operated in 1999 except on January 26, 1999. See second paragraph of Section 2.0 in <br /> revised workplan dated September 1,2000. <br /> 3. Six liter Summa®canisters will be used rather than Tedlar®bags. See first paragraph of Section 3.2 in revised <br /> workplan dated September 1,2000. <br /> 4. EPA Method TO-14 will be used. See third paragraph of Section 3.2 in revised workplan dated September 1, <br /> 2000. <br /> 5. Monitoring point OB-1 was added to Figure 2. See Figure 2 in revised workplan dated September 1,2000. <br />
The URL can be used to link to this page
Your browser does not support the video tag.