My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SITE INFORMATION AND CORRESPONDENCE
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
I
>
INDUSTRIAL
>
230
>
2900 - Site Mitigation Program
>
PR0009051
>
SITE INFORMATION AND CORRESPONDENCE
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/5/2020 12:26:47 PM
Creation date
2/5/2020 10:23:06 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
SITE INFORMATION AND CORRESPONDENCE
RECORD_ID
PR0009051
PE
2960
FACILITY_ID
FA0000649
FACILITY_NAME
FORMER NESTLE USA INC FACILITY
STREET_NUMBER
230
STREET_NAME
INDUSTRIAL
STREET_TYPE
DR
City
RIPON
Zip
95366
APN
25938001
CURRENT_STATUS
01
SITE_LOCATION
230 INDUSTRIAL DR
P_LOCATION
05
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
790
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Margaret Lagorio [EH] <br /> From: Holly Orndorff[horndorff@ecostmanage.com] <br /> Sent: Monday, June 21, 2004 2:04 PM <br /> To: Margaret Lagorio[EH] <br /> Subject: FW: Nestle Intermediate Aquifer Well Installation Work Plan <br /> Here is the final approval of the work plan by RWQCB. <br /> Holly <br /> 510.222.2550 <br /> -----Original Message----- <br /> From: Marcus Pierce [mailto:PierceM@rb5s.swrcb.ca.gov] <br /> Sent: Monday, June 21, 2004 1:39 PM <br /> To: horndorff@ecostmanage.com <br /> Cc: bacharya@ecostmanage.com; binayak.acharya@us.nestle.com <br /> Subject: RE: Nestle Intermediate Aquifer Well Installation Work Plan <br /> Thanks for making the requested revisions to the Work Plan. I have no <br /> additional comments. Please let me know when you intend to start the field <br /> work. I may collect a few groundwater split samples. <br /> Marcus L. Pierce <br /> Associate EG <br /> CVRWQCB <br /> 916-464-4733 <br /> >>> "Holly Orndorff" <horndorff@ecostmanage.com> 06/21/04 12:51PM >>> <br /> Hello Marcus, <br /> Thank you for reviewing our work plan so quickly. Attached is the revised <br /> work plan, which addresses your comments. Please note that we plan to treat <br /> decon water at the Industrial Avenue system, which currently discharges to <br /> the city sewer. The amount of decon water that will be run through the <br /> system is insignificant compared to the volume that is treated daily at <br /> either system and it will not affect the water quality of the final <br /> discharge water. <br /> Holly <br /> 510.222.2550 <br /> -----Original Message----- <br /> From: Marcus Pierce [mailto:PierceM@rb5s.swrcb.ca.gov] <br /> Sent: Friday, June 18, 2004 3:47 PM <br /> To: horndorff@ecostmanage.com <br /> Cc: bacharya@ecostmanage.com <br /> Subject: Nestle Intermediate Aquifer Well Installation Work Plan <br /> Hi Holly, <br /> CVRWQCB concurs with the Work Plan provided the following changes are made: <br /> 1) During advancement of the pilot hole, Nestle should collect groundwater <br /> grab samples from each significant sand/gravel layer encountered between 120 <br /> and 200 feet bgs. I think this what you intend to do, but it is unclear in <br /> the Work Plan. <br /> 2) Include trip blanks with each shipment of samples to the lab. <br /> 3) The Work Plan indicates purge and decon water will be disposed in one of <br /> Nestle's groundwater treatment systems and then discharged to the City of <br /> Ripon's Industrial sewer system. Do you actually mean discharged to the new <br /> 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.