My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SITE INFORMATION AND CORRESPONDENCE
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
I
>
INDUSTRIAL
>
230
>
2900 - Site Mitigation Program
>
PR0009051
>
SITE INFORMATION AND CORRESPONDENCE
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/5/2020 12:26:47 PM
Creation date
2/5/2020 10:23:06 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
SITE INFORMATION AND CORRESPONDENCE
RECORD_ID
PR0009051
PE
2960
FACILITY_ID
FA0000649
FACILITY_NAME
FORMER NESTLE USA INC FACILITY
STREET_NUMBER
230
STREET_NAME
INDUSTRIAL
STREET_TYPE
DR
City
RIPON
Zip
95366
APN
25938001
CURRENT_STATUS
01
SITE_LOCATION
230 INDUSTRIAL DR
P_LOCATION
05
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
790
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
MONITORING AND REPORTING PROGRAM N0.99-079 -3- <br /> NESTLE USA-BEVERAGE COMPANY INC. <br /> RIPON FACILITY <br /> SAN JOQUIN COUNTY <br /> The Discharger shall submit a Pilot Test Summary Report to the Board 60 days after the 6 month <br /> potassium permanganate pilot study is completed. The report shall contain both tabular and graphical <br /> summaries of the monitoring data obtained during the 6 month pilot study, including the evaluations <br /> described in Provision No. 2. In addition,the Discharger shall discuss the compliance record and the <br /> corrective action taken or planned which may be needed to bring the discharge into full compliance with <br /> the waste discharge requirements. <br /> The Discharger shall implement the above monitoring program within a week of the start of the pilot <br /> study. <br /> Ordered by: <br /> ARLTON,Executive Officer <br /> 11 June 1999 <br /> (Date) <br /> AMENDED <br /> RRR:dlk/lsb _ <br /> c:\nestle.mrp <br />
The URL can be used to link to this page
Your browser does not support the video tag.