My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_2010 ANNUAL REPORT
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
I
>
INDUSTRIAL
>
230
>
2900 - Site Mitigation Program
>
PR0009051
>
ARCHIVED REPORTS_2010 ANNUAL REPORT
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/5/2020 8:37:32 PM
Creation date
2/5/2020 10:30:21 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
ARCHIVED REPORTS
FileName_PostFix
2010 ANNUAL REPORT
RECORD_ID
PR0009051
PE
2960
FACILITY_ID
FA0000649
FACILITY_NAME
FORMER NESTLE USA INC FACILITY
STREET_NUMBER
230
STREET_NAME
INDUSTRIAL
STREET_TYPE
DR
City
RIPON
Zip
95366
APN
25938001
CURRENT_STATUS
01
SITE_LOCATION
230 INDUSTRIAL DR
P_LOCATION
05
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
1213
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Nestle USA, Inc., Ripon, California March 31, 2011 <br /> 2010 Annual Report <br /> Section 7 Planned Activities for 2011 <br /> Section 8 Endnotes <br /> 2 KEY ACTIVITIES IN 2010 <br /> ECM conducted activities on behalf of Nestle in 2010: <br /> • Water Replacement Contingency Plan (WRCP) <br /> o Revised the 2007 WRCP and submitted to the RWQCB; <br /> o Implemented the "priority well,,b tracking process; <br /> o Completed replacement of well at 5725 Hall Road; <br /> o Installed a granular activated carbon (GAC) wellhead treatment system at 802 <br /> Vera Avenue, <br /> • Groundwater Investigation <br /> o Conducted M-10A Investigation; <br /> • Groundwater Monitoring <br /> o Monitored per MRP; <br /> Interim Remedial Action Plan (TRAP) System Performance, <br /> o Performed Capture Analysis; <br /> • 2011 Revised Feasibility Study <br /> o Performed groundwater modeling to assist the preparation of the revised FS <br /> report; <br /> o Conducted an intrinsic remediation (IR) sampling study for limited wells; <br /> o Prepared a revision to the 2009 Feasibility Study Report (submitted on January <br /> 28, 2011); <br /> • Water Management Plan <br /> o Conducted well survey for the Water Management Plan for the Ripon Study Area <br /> (WMP); <br /> o Completed groundwater modeling to assist the development of buffer zones <br /> described in the WMP; <br /> • Stockton Avenue Activities <br /> o Shut down the groundwater extraction and remediation system; <br /> • Vapor Extraction Well Closure <br /> o Closed wells VE-4, VE-11, and VE-12. <br /> The subsections below summarize the activities associated with each item. Details for the <br /> WRCP, the well installation at 5725 Hall Road, the M-10A investigation, the IRAP system <br /> b Priority wells are domestic supply, municipal supply, non-potable municipal supply, agricultural supply, industrial <br /> supply, and guard wells identified by the WRCP. <br /> 2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.