Laserfiche WebLink
Nestle USA, Inc., Ripon, California March 31, 2011 <br /> 2010 Annual Report <br /> and EU-4, each running at 31 gpm. Wells EI-1, EU-3 and EU-4 continue to operate at these rates <br /> as of the date of this report. <br /> 4.1.2 PERFORMANCE MONITORING <br /> Water quality samples were collected from three locations, consistent with MRP requirements for <br /> monitoring: <br /> • The influent to the first in-series carbon vessel, <br /> • The midpoint on the piping between the second and third carbon vessels, and <br /> • The effluent after the final carbon vessel. <br /> The monitoring frequency at each location was revised in the 2010 MRP (Table 9.1). Currently <br /> ECM samples the influent and effluent locations quarterly and the midpoint location monthly. <br /> Historical TCE concentrations for extraction wells EU-3 and EU-4 (Table 3.1) are illustrated below. <br /> Industrial Avenue Extraction Well TCE Concentrations over Time <br /> 350 <br /> 300 <br /> 250 <br /> EU-3 <br /> 0 200 EU-4 <br /> .2 <br /> R <br /> L <br /> 150 <br /> m <br /> c <br /> U 100 <br /> W <br /> 50 <br /> 0 <br /> Mar-08 May-08 Aug-08 Nov-08 Mar-09 May-09 Aug-09 Nov-09 Mar-10 May-10 Aug-10 Nov-10 <br /> Sample Date <br /> The general decline of concentrations of TCE in EU-3 and EU-4 indicate that the areas of <br /> highest TCE impact, which were targeted as part of the IRAP, have undergone significant <br /> reductions in dissolved TCE concentrations. TCE concentrations in wells EU3 and EU-4 in July <br /> 2010 were 94% and 98% lower than the concentrations observed in the wells in March 2008. <br /> Mass removal rates have dropped from 0.60 pounds of TCE per day in the first quarter of 2008 <br /> to 0.03 pounds of TCE per day during the third quarter of 2010. <br /> Based on in-field monitoring and groundwater modeling of the Industrial Avenue area23, wells <br /> EU-3 and EU-4 appear to provide the intended hydraulic containment, as proposed in the <br /> Industrial Avenue Facility Interim Remedial Action Plan, Well Installation and Aquifer Test <br /> Report24. <br /> 21 <br />