Laserfiche WebLink
Groundwater Extraction Treatment System Report <br /> Month: October-10 <br /> Submitted by: Nestle USA, Inc. <br /> Submittal Date: 19-Nov-10 <br /> Groundwater Treatment System Down Time' <br /> Industrial Avenue <br /> Time Down time <br /> Date Shutdown Start up (hr:min:sec) Comments <br /> 10/29/2010 10/29/2010 16:20 10/29/2010 16:50 0:30:00 Manual shutdown to test the capacity for EI-1 pumping. <br /> Total Down Time(hours) 0:30:00 <br /> •Down time 0.07% <br /> •Up time 99.93% <br /> Groundwater Treatment System Flow <br /> Time Period <br /> Number of Down Time Total Flow Avg. Flow <br /> Location Wells From To Days (days) (Gal) (gpm) <br /> EU-3 1-Oct-10 29-Oct-10 28 0.02 1,179,833 29.28 <br /> Industrial Avenue <br /> EU-4 1-Oct-10 29-Oct-10 28 0.02 1,172,900 29.11 <br /> 1.The Stockton Avenue System was turned off on October 1,2010. <br /> Page 1 of 4 <br />