Laserfiche WebLink
Nestle USA, Inc., Ripon, California March 31, 2011 <br /> 2010 Annual Report <br /> 3. Submit the final Water Management Plan to the RWQCB; <br /> 4. Submit an analysis of Upper Aquifer monitoring data in the Fourth Quarter of 2011 as <br /> part of the Stockton Avenue extraction and treatment system shutdown evaluation; <br /> 5. Review COC trends in monitoring wells and propose changes to the MRP, if <br /> appropriate. An updated version of the MRP will be proposed in 2011; and <br /> 6. Upon approval of the Revised FS, prepare and submit an Intrinsic Remediation <br /> Work Plan which documents and incorporates Study Area IR monitoring data. <br /> 7.2 PROPOSED FIELD AND OTHER ACTIVITIES <br /> The following activities are proposed for the year 2011: <br /> 1. Continue groundwater monitoring and sampling per the revised MRP; <br /> 2. Conduct quarterly well inspections during each sampling event; <br /> 3. Conduct stakeholder meetings among the RWQCB, the City of Ripon, Diamond Pet <br /> Food, Ripon Co-gen, and MID, to provide an ongoing forum for discussing solutions <br /> to local water quality and supply issues ; <br /> 4. Finalize the Water Management Plan. Continue dialogue with City of Ripon to <br /> understand and provide feedback to regarding municipal water management issues, <br /> including the installation of new drinking water wells, seasonal operation of existing <br /> wells, use of recharge water, operation of the wastewater treatment system, etc. <br /> 29 <br />