Laserfiche WebLink
ATTACHMENT A.3 <br /> SOIL VAPOR EXTRACTION (SVE)ACTIVITIES AT INDUSTRIAL AVENUE SITE <br /> Table of Contents <br /> 1 INTRODUCTION 2 <br /> 1.1 Soil Vapor Extraction 2 <br /> 1.2 Background Information at 230 Industrial Avenue Site 2 <br /> 2 SVE DATA EVALUATION 3 <br /> 2.1 Assessment of SVE System Mass Removal 3 <br /> 2.2 Sampling Following SVE Remedial Activities 3 <br /> 3 CONCLUSIONS 4 <br /> 4 ENDNOTES 5 <br /> Figures <br /> Figure A.3-1: Site Location Map <br /> Figure A.3-2 SVE Extraction Well Network <br /> Figure A.3-3: Post-Remediation Soil Vapor Sampling Locations <br /> Tables <br /> Table A.3-1: Historic SVE Extraction and Soil Vapor Monitoring Well Results <br />