Laserfiche WebLink
TABLE B.2-1 ameO <br /> Feasibility Study Cost Estimate <br /> Bioaugmentation Bio-curtain <br /> Nestle Ripon <br /> 1.0 REMEDIAL DESIGN INVESTIGATION <br /> Quantity Unit Unit Cost Cost Source <br /> 1.1 project planning/work plan/HASP 1 LS $ 50,000 $ 50,000 amec estimate <br /> 1.2 utility clearance 1 LS $ 15,000 $ 15,000 amec estimate <br /> 1.3 mobilization(2xdrilling rigs) 2 LS $ 5,000 $ 10,000 contractor estimate <br /> 1.4 per diem(2xdrilling crew) 23 DAY $ 800 $ 18,400 contractor estimate <br /> 1.5 bobcat(moving soil drums) 23 DAY $ 250 $ 5,750 contractor estimate <br /> 1.6 sonic drilling 9,000 FT $ 60 $ 540,000 contractor estimate <br /> 1.7 cmt well material 9,000 FT $ 30 $ 270,000 contractor estimate <br /> 1.8 oversite 23 DAY $ 1,500 $ 34,500 amec estimate <br /> 1.9 disposal of soil cuttings 486 drum $ 120 $ 58,320 laboratory rates <br /> 1.10 well development 45 EA $ 1,000 $ 45,000 amec estimate <br /> 1.11 groundwater sampling(labor) 45 EA $ 700 $ 31,500 amec estimate <br /> 1.12 groundwater sampling(analytical) 363 EA $ 70 $ 25,410 laboratory rates <br /> 1.13 survey 5 DAY $ 3,000 $ 15,000 assume 5 trips <br /> 1.14 lremedial design investigation report 1 EA $ 75,000 $ 75,000 1 amec estimate <br /> Estimated Remedial Design Investigation Costs $ 1,193,880 <br /> 2.0 PRE-CONSTRUCTION COSTS <br /> Quantity Unit Unit Cost Cost Source <br /> 2.1 remedial design(6%of capital costs) 1 LS $ 1,717,561 $ 1,717,561 EPA,2000 <br /> 2.2 project management,permitting,legal(5%of capital 1 LS $ 1,431,301 $ 1,431,301 1 EPA,2000 <br /> costs <br /> Estimated Pre Construction Costs $ 3,148,861 <br /> AMEC Geomatrix,Inc. <br /> \\oad-fs1\doc_safe\9000s\9837.006\4000 REGULATORY\FS Assessment_Apx B_012711\Attachment B.2\Attachment 13.2-Bioaugmentation-Tables B.2-1 to B.2-3.xlsx Page 1 of 2 <br />