Laserfiche WebLink
TABLE B.3-1 amec�9 <br /> Feasibility Study Cost Estimate <br /> Groundwater Recirculation <br /> Nestle Ripon <br /> 1.0 REMEDIAL DESIGN INVESTIGATION <br /> Quantity Unit Unit Cost Cost Source <br /> 1.1 project planning/work plan/HASP 1 LS $ 50,000 $ 50,000 amec estimate <br /> 1.2 drilling 0 LS $ _ $ drilling cost covered under well <br /> installation <br /> 1.3 field geologist 47 DAY $ 1,500 $ 70,500 amec estimate <br /> 1.4 vehicle 10 WK $ 500 $ 5,000 amec estimate <br /> 1.5 field supplies 10 WK $ 250 $ 2,500 amec estimate <br /> Estimated Remedial Design Investigation Costs $ 128,000 <br /> 2.0 PRE-CONSTRUCTION COSTS <br /> Quantity Unit Unit Cost Cost Source <br /> 2.1 remedial design(8%of capital costs) 1 LS $ 334,589 $ 334,589 EPA,2000 <br /> 2.2 project management,permitting,legal(5%of 1 LS $ 209,118 $ 209,118 EPA,2000 <br /> capital costs <br /> Estimated Pre Construction Costs $ 543,707 <br /> AMEC Geomatrix, Inc. <br /> \\oad-fs1\doc_safe\9000s\9837.006\4000 REGULATORY\FS Assessment_Apx B_012711\Attachment B.3\Attachment 6.3-GW recirc-Table B.3-1 to B.3-2.xlsx Page 1 of 2 <br />