Laserfiche WebLink
Alternative 3-Short-term(5-year)Pump and Treat;In-situ Treatment of 2 <br /> 2011 Revised Feasibility Study(Appendix D) <br /> Former Nestle USA,Inc.Facility,Ripon,CA <br /> Pump&Treat for containment and mass removal <br /> Pump&Treat Upper Aquifer-use 5 existing wells: <br /> EU-3 and EU-4 @ 30 gpm each,EI-1 @ 90gpm,E <br /> 2 @ 60 gpm,E-6 @ 300 gpm. All wells pumping <br /> for 5 years= <br /> 270 million gallons per year <br /> Capital <br /> New Monitoring Wells for performance <br /> evaluation($30,000/ea) 4 wells $120,000 <br /> Sub Total Well Installation $120,000 <br /> O&M <br /> Annual O&M(carbon changeout,electricity,gas <br /> and other utilities,technician,sampling& <br /> analysis) $300,000 <br /> Water disposal costs($1,050/106 gal.) 268.0 $281,400 <br /> Consulting and reporting for O&M 20% $116,280 <br /> Total annual O&M $697,680 <br /> Sub Total O&M(first 5 years) $3,488,400 <br /> Decommission <br /> Decommission costs(wells and extraction <br /> system) $150,000 <br /> Consulting and negotiations for deoom. 20% $30.000 <br /> Sub Total $180,000 <br /> Sub Total for Pump and Treat for Containment <br /> and Mass Removal $3,788,400 <br /> In-situ Treatment in Upper/Intermediate Aquifer <br /> In-situ treatment,Capital and Installation Area=200ftx150ft,9 wells <br /> Risk evaluation,WDR permitting,etc. $100,000 <br /> Treatment zone characterization for design $200,000 <br /> Mass removal with in situ treatment $800,000 <br /> Consulting,permitting,constr oversight,etc. 20% $220,000 <br /> Sub Total $1,320,000 <br /> O&M <br /> Performance Monitor Annual O&M $400,000 <br /> Consulting,reporting,and reg.interaction 20% $80.000 <br /> Annual O&M $480,000 <br /> Sub Total O&M 2 years $960,000 <br /> Decommission <br /> Decommission costs 9 wells $90,000 <br /> Consulting and negotiations for decom. 20% $18,000 <br /> Sub Total Decommissioning $108,000 <br /> Sub Total for In-situ Treatment in 2locations $3,348,000 <br /> Upper/Intermediate Aquifer <br /> Institutional Controls <br /> Abandon Vertical Conduits(up to 5 additional <br /> wells) $30K per well $150,000 <br /> Water Supply Replacement Activities $450,000 <br /> Investigation of other potential conduits $100,000 <br /> Coordinate Municipal Pumping 4 yearly meetings <br /> Meetings with City of Ripon $400,000 <br /> Duration 20 years <br /> Sub Total for Institutional Control $1,100,000 <br /> Intrinsic Remediation(IR) <br /> Monitor existing wells quarterly(60 wells in all <br /> aquifers) <br /> Work Plan,Sampling and Reporting to Establish <br /> Lines of Evidence for IR(1 at year) $200,000 <br /> Five year Evaluation @$100,00 per event 30 years $600,000 <br /> Annual Monitoring(per year) 29 years $580,000 <br /> Sub Total Intrinsic Remediation 30 years $1,380,000 <br /> Revised Alternative 3 Total Cost $9,616,400 <br /> Ongoing monitoring,sampling,analysis,reporting,and project management is not included in <br /> this cost estimate. <br />