Laserfiche WebLink
9 <br /> 6 ENDNOTES <br /> IT Corporation. Permanganate Pilot Study Six Month Summary Report (Revised), <br /> Nestle USA, Beverage Division Inc., Former Ripon CA Facility, September 2000. <br /> 2 Suthan S. Suthersan , Remediation Engineering: Design Concepts, ARCADIS, <br /> Newtown, Pennsylvania, USA, October, 1996 <br /> 3 IT Corporation., Permanganate Pilot Study Six Month Summary Report (Revised), <br /> Nestle USA, Beverage Division Inc., Former Ripon CA Facility, September 1998. <br /> 4 IT Corporation, Interim Report Summarizing Background Sampling and Bench <br /> Scale Test for the KMn04 Pilot Study(Interim Report), Nestle USA, Beverage <br /> Division Inc., Former Ripon CA Facility, December 1998. <br /> 5 IT Corporation., Permanganate Pilot Study Six Month Summary Report (Revised), <br /> Nestle USA, Beverage Division Inc., Former Ripon CA Facility, September 1998. <br /> 6 IT Corporation., Permanganate Pilot Study Six Month Summary Report (Revised), <br /> Nestle USA, Beverage Division Inc., Former Ripon CA Facility, September 2000. <br /> 7 IT Corporation. Permanganate Pilot Study Six Month Summary Report (Revised), <br /> Nestle USA, Beverage Division Inc., Former Ripon CA Facility, September 2000. <br />