22 Arcadis G&M, Inc., June 26, 2003. Draft Exploratory Boring Report June 2003 Former Nestle USA,
<br /> Inc. Facility, Ripon CA. and Environmental Cost Management, Inc., January 15, 2004. Exploratory
<br /> Boring Report Former Nestle USA, Inc. Facility, Ripon CA
<br /> 23 Environmental Cost Management, Inc., August 26, 2004. Intermediate Aquifer Well Installation Report
<br /> Wells M-30C1, M-30C2, M31 C1 and M-31 C2/D Former Nestle Facility, Ripon CA
<br /> 24 Environmental Cost Management, Inc., September 15, 2006. Final Well Installation Report for Plume
<br /> Delineation. South of the Stanislaus River, Former Nestle USA, Inc. Ripon CA
<br /> 25 Geomatrix Consultants, April 2006, Initial Testing and Characterization Report, In Situ Groundwater
<br /> Remediation Program, Former Nestle Facility, Ripon, California.
<br /> 26 Environmental Cost Management, Inc., November 13, 2009. Third Quarter 2009 Site Status
<br /> Report, Former Nestle USA, Inc. Facility, 230 Industrial Avenue, Ripon, California 95366.
<br /> 27 ECM, May 8, 2007. Lower Aquifer Zone Investigation and Additional Well Installation Report, Former
<br /> Nestle USA, Inc. Facility Ripon, California.
<br /> 28 Environmental Cost Management, Inc., M-10A Investigation Work Plan, Former Nestle USA, Inc.
<br /> Facility, 230 Industrial Avenue, Ripon, California 95366. June 11, 2010.
<br /> 29 Environmental Cost Management, Inc., M-10A Investigation Report, Former Nestle USA, Inc. Facility
<br /> Ripon, California, November 30, 2010.
<br /> 30 Bureau of Reclamation and San Joaquin River Group Authority. San Joaquin River Agreement 1999-
<br /> 2010, Environmental Impact Statement and Environmental Impact Report, Appendix B. January 28,
<br /> 1999
<br /> 31 California Coastal Commission: http://www.coastal.ca.gov/ccbn/keep_the_delta_clean.html
<br /> 32 AMEC Geomatrix, January 30, 2009. Site Conceptual Model-January 2009 Update, Former Nestle
<br /> Facility and Surrounding Area, Ripon.
<br /> 33 Burow, K. R., Shelton, J. L., Hevesi, J. A., and Weissman, G. S., 2004, Hydrogeologic
<br /> Characterization of the Modesto Area, San Joaquin Valley, California, Scientific Investigations Report
<br /> 2004-5232.
<br /> 34 AMEC Geomatrix, January 30, 2009. Site Conceptual Model-January 2009 Update, Former Nestle
<br /> Facility and Surrounding Area, Ripon
<br /> 35 Environmental Cost Management, Inc. 2011 Revised Feasibility Study, Former Nestle USA, Inc.
<br /> Facility Ripon, CA. January 29, 2011.
<br /> 36 Reference unavailable.
<br /> 37 IT Corporation, September 11, 2000. Permanganate Pilot Study Six Month Summary Report
<br /> (Revised) Former Nestle USA—Beverage Division, Inc. Facility, Ripon, California
<br /> 38 Geomatrix Consultants, April 2006. Initial Testing and Characterization Report, In Situ Groundwater
<br /> Remediation Program, Former Nestle Facility, Ripon, California
<br /> 39 Environmental Cost Management, Inc., March 31, 2008, Revised October 15, 2008. 2007 Annual
<br /> Groundwater Monitoring Report, Nestle USA, Inc. Facility, Ripon CA.
<br /> 40 Environmental Cost Management, Inc. 2011 Revised Feasibility Study, Former Nestle USA, Inc.
<br /> Facility Ripon, CA. January 29, 2011.
<br /> 41 AMEC Geomatrix, January 30, 2009. Site Conceptual Model-January 2009 Update, Former Nestle
<br /> Facility and Surrounding Area, Ripon.
<br /> 42 Environmental Cost Management, Inc., November 9, 2009. Re: Stockton Avenue Groundwater
<br /> Extraction System Shut-down Request, Former Nestle USA, Inc. , 230 Industrial Avenue, Ripon, CA
<br /> 95366.
<br />
|