My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_MONITORING WELL M-10 INVESTIGATION REPORT 2010
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
I
>
INDUSTRIAL
>
230
>
2900 - Site Mitigation Program
>
PR0009051
>
ARCHIVED REPORTS_MONITORING WELL M-10 INVESTIGATION REPORT 2010
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/5/2020 2:25:16 PM
Creation date
2/5/2020 10:49:05 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
ARCHIVED REPORTS
FileName_PostFix
MONITORING WELL M-10 INVESTIGATION REPORT 2010
RECORD_ID
PR0009051
PE
2960
FACILITY_ID
FA0000649
FACILITY_NAME
FORMER NESTLE USA INC FACILITY
STREET_NUMBER
230
STREET_NAME
INDUSTRIAL
STREET_TYPE
DR
City
RIPON
Zip
95366
APN
25938001
CURRENT_STATUS
01
SITE_LOCATION
230 INDUSTRIAL DR
P_LOCATION
05
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
271
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
M-10A Investigation Report November 30, 2010 <br /> Nestle USA, Inc., Ripon, California <br /> CONTENTS <br /> 1 Introduction........................................................................................................................ 1 <br /> 2 Purpose of Investigation .................................................................................................... 1 <br /> 2.1 Hydrogeology of Study Area ..................................................................................... 1 <br /> 2.2 History of TCE Concentrations in Well M-10A........................................................... 2 <br /> 2.3 Objectives................................................................................................................. 3 <br /> 2.4 Approach .................................................................................................................. 3 <br /> 3 Procedures........................................................................................................................ 4 <br /> 3.1 Field Preparation....................................................................................................... 4 <br /> 3.1.1 Permitting...................................................................................................... 4 <br /> 3.1.2 Access .......................................................................................................... 4 <br /> 3.1.3 Traffic Control Plan........................................................................................ 4 <br /> 3.1.4 City of Ripon Permit Site Walk....................................................................... 5 <br /> 3.1.5 Subsurface Utility Clearance ......................................................................... 5 <br /> 3.2 CPT Drilling............................................................................................................... 5 <br /> 3.3 Groundwater sampling.............................................................................................. 5 <br /> 3.4 Decontamination....................................................................................................... 6 <br /> 3.5 Investigation Derived Waste ..................................................................................... 6 <br /> 4 Investigation Results ......................................................................................................... 6 <br /> 4.1 Borehole Lithology.................................................................................................... 6 <br /> 4.2 Laboratory Results.................................................................................................... 6 <br /> 4.2.1 Upper A Zone TCE Results (50 to 80 Feet BGS)........................................... 7 <br /> 4.2.2 Middle A Zone TCE Results (80 to 95 Feet BGS).......................................... 7 <br /> 4.2.3 Lower A Zone TCE Results (100 to 115 Feet BGS)....................................... 7 <br /> 4.2.4 Other Chemicals of Concern ......................................................................... 7 <br /> 5 Discussion......................................................................................................................... 7 <br /> 5.1 Data Analysis and Interpretation ............................................................................... 8 <br /> 5.2 Conclusions and Recommendations....................................................................... 10 <br /> 6 Remedial Measure .......................................................................................................... 11 <br /> 7 Endnotes......................................................................................................................... 12 <br /> i <br />
The URL can be used to link to this page
Your browser does not support the video tag.