Laserfiche WebLink
Monthly Treatment System Performance Report <br /> Month: June-09 <br /> Submitted by: Nestle USA, Inc. <br /> Submittal Date: 28-Jul-09 <br /> Incident/Corrective Action Report <br /> Location Incident Corrective Action <br /> Industrial Avenue <br /> none No corrective action. <br /> Treatment System <br /> Stockton Avenue none Air stripper was cleaned as part of planned maintenance <br /> Treatment System <br /> Notes: <br /> Short-duration shutdowns (approximately 20 to 60 minutes)may be caused by fluctuations in the supply power. These shut downs and start ups are part of the normal <br /> operation to protect the equipment from serious damage during under voltage conditions. The automatic restart includes purge, preheat and transfer-to-process operations <br /> that take approximately 20 minutes to complete. The Stockton Avenue treatment system ran for 89.29%of the time in the month of June, 2009. The Industrial Avenue <br /> treatment system ran 100%of the time in June, 2009. <br /> Page 4 of 4 <br />