My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2020
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
E
>
EL DORADO
>
8115
>
2800 - Aboveground Petroleum Storage Program
>
PR0516364
>
COMPLIANCE INFO_2020
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/29/2021 9:27:45 AM
Creation date
2/5/2020 11:52:07 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2800 - Aboveground Petroleum Storage Program
File Section
COMPLIANCE INFO
FileName_PostFix
2020
RECORD_ID
PR0516364
PE
2832
FACILITY_ID
FA0000110
FACILITY_NAME
J & L MARKET
STREET_NUMBER
8115
Direction
S
STREET_NAME
EL DORADO
STREET_TYPE
ST
City
FRENCH CAMP
Zip
95231
APN
19317003
CURRENT_STATUS
01
SITE_LOCATION
8115 S EL DORADO ST
P_LOCATION
99
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\kblackwell
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
71
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
J & L Markel, Diesel Tank (Facilitiv 11863), STI-SP001 , Febr•irur•>> 2020 <br /> Disclaimer <br /> The information referenced in this engineering report is based solely upon the area or areas <br /> agreed upon and contracted for inspection on the date of the inspection and under those present, <br /> known , same , and current conditions . This report was prepared using retrievable data from those <br /> areas that were properly cleaned and prepared and made available and accessible during the <br /> inspection . Areas not contracted for inspection and areas that were not cleaned and made <br /> available and accessible are not ' included in this report . The methods , standards and regulations <br /> used by Pacific Engineering & Consulting during the inspection and in preparing this <br /> engineering report comply with the most current and widely accepted standards and regulations <br /> in the industry, in which these standards and regulations make no representation , warranty or <br /> guarantee . The professional opinions and recommendations stated in this report , including <br /> predictability of life , maximum length of time for re- inspection , suitability for product storage , <br /> and safe fill height are conclusive approximations and are intended to serve mainly as guidelines <br /> for obtaining the utmost in spill prevention and environmental protection . The listed <br /> recommendations may not necessarily be mandatory actions , but corrective actions that Pacific <br /> Engineering & Consulting suggests would better preserve the owners ' /operators ' facility <br /> components and may contribute to a safer and more convenient operation . Failure to comply <br /> with these could result in , but may not be limited to , reduction of service line , tank mishap , legal <br /> consequences and/or fines for owners/operators . It is best advised that the recommended repairs , <br /> corrective actions and procedures be fully and accurately complied with in order to meet the <br /> required and applicable federal , state and local regulations , and to have the necessary repairs and <br /> upgrades performed prior to making any change in service , product and/or current conditions . <br /> Some recommendations and requirements are necessary to bring the components) into <br /> compliance with federal , state, and local regulations . Pacific Engineering & Consulting <br /> recommends re- inspection after any corrective action , repair or change in usage when the change <br /> is to a more severe service . Any change in facility conditions that are applicable to this <br /> inspection report , such as , but not limited to , a change in service or usage could result in <br /> outdating this report . The predictability of any component in this report is a result of following <br /> the procedures in the applicable industry standard . Pacific Engineering & Consulting accepts <br /> absolutely no responsibility or liability for any mishap or failure , including any subsequent <br /> E clean - up costs or legal ramifications , resulting from owners ' /operators ' failure to perform the <br /> required repairs , inspections and re- inspections , as they apply . <br /> t <br /> I r <br /> I <br />
The URL can be used to link to this page
Your browser does not support the video tag.