My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SITE INFORMATION AND CORRESPONDENCE
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
H
>
HOLLY
>
20500
>
2900 - Site Mitigation Program
>
PR0009165
>
SITE INFORMATION AND CORRESPONDENCE
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/5/2020 7:43:43 PM
Creation date
2/5/2020 1:18:51 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
SITE INFORMATION AND CORRESPONDENCE
RECORD_ID
PR0009165
PE
2960
FACILITY_ID
FA0004570
FACILITY_NAME
SPRECKELS SUGAR CO
STREET_NUMBER
20500
STREET_NAME
HOLLY
STREET_TYPE
DR
City
TRACY
Zip
953041649
CURRENT_STATUS
01
SITE_LOCATION
20500 HOLLY DR
P_LOCATION
03
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
91
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Ms. Anne Ogrey . • <br /> Holly Sugar-Tracy - 3 - 19 August 2008 <br /> 7. Spreckels proposes including the results of the well installation activities in a future <br /> quarterly report. The well installation report needs to be a separate document and not <br /> included with quarterly monitoring results. The well installation report will be due <br /> 60 days after approval of the revised work plan and must include soil sample results, <br /> groundwater results, boring logs, figures showing the locations of the new wells, and <br /> recommendations for future activities. <br /> 8. The Work Plan proposes continuing to sample the new well only if results confirm there <br /> are petroleum hydrocarbons in groundwater in this location. Regional Water Board <br /> staff does not agree. Spreckels needs to continue to monitor all new wells quarterly for <br /> a minimum of one year to evaluate any seasonal trends. Regional Water Board staff <br /> prepared a draft Monitoring and Reporting Program (MRP) for the Site to describe the <br /> required sampling program. By 15 September 2008, Spreckels needs to review the <br /> attached draft MRP and submit any comments. <br /> The draft MRP includes the requirement to analyze Site wells for semi volatile organic <br /> compounds (SVOCs) and polycyclic aromatic hydrocarbons (PAHs). It also includes the <br /> California Code of Regulations, Title 23, Division 3, Chapter 30 requirement for <br /> electronic submittals over the Internet to the State Water Resources Control Board <br /> Geotracker database system. SVOCs and PAI-Is are potential components of fuel oil, <br /> so Spreckels needs to determine whether these are compounds of concern at the Site. <br /> The Geotracker Global Idenfication Number for the Site is SL375233642. All <br /> documents, including work plans, correspondence, quarterly monitoring reports, <br /> investigation/cleanup reports, etc.; and all analytical and site data must be electronically <br /> uploaded to the State Water Resources Control Board's GeoTracker database and are <br /> due at the time the paper copy is submitted to this office. Until you receive further <br /> direction from Regional Water Board staff, you also are required to submit paper copies <br /> of all reports and correspondence. Your retained environmental consultant can upload <br /> all required documents and files at your request. <br /> In summary, by 15 September 2008, please submit a revised work plan and comments on the <br /> attached draft MRP. The revised work plan must show how Spreckels plans to define the <br /> lateral extent of the groundwater plume, include a figure showing the locations of the proposed <br /> monitoring wells, and clarify the location of a well near FOP-1 R. In addition, the third <br /> quarter 2008 monitoring report is due 1 November 2008. <br /> If you have any questions, you may contact me by phone at (916) 464-4819 or by email at <br /> kshelton(@.waterboards.ca.gov. <br /> KRISTIN SHELTON <br /> Water Resources Control Engineer <br /> Aboveground Tanks Cleanup Unit <br /> Attachments <br /> cc: Mr. Harlin Knoll, San Joaquin County Environmental Health Department, Stockton <br /> Mr. John Minney, Madera Ranchos <br />
The URL can be used to link to this page
Your browser does not support the video tag.