Laserfiche WebLink
3 SPILL PREVENTION CONTROL AND COUNTERMEASURE (SPCC) PLAN CHECKLIST <br /> YES NO N/A COMMENTS <br /> 34 Is there a discussion of an appropriate ground water X <br /> monitoring system [H&S 25270.7]? <br /> 35 Is there a strong contingency plan [112.7(d)]? X <br /> 36 Is there a written commitment to control spills [112.7(d)]? X <br /> 37 Is there a discussion of facility drainage from diked areas X • <br /> [112.7(e)(1)]? <br /> 38 Is there a discussion of secondary containment [112.7(e)(2)]? X <br /> 39 Are records kept of drainage from diked areas [112.7(e)(2)(iii)(D)]? X <br /> 40 Are records kept of steam return or exhaust lines that discharge X <br /> to surface waters [112.7(e)(2)(vii)(A)]? <br /> 41 Are the following devices used [112.7(e)(2)(viii)]? <br /> 42 High level alarms with audible or visual signs? X <br /> 43 High level pump cutoff devices? X <br /> 44 Direct audible or code signals between sensor and pump X <br /> station? <br /> 45 A fast response system for determining liquid level? X <br /> 46 Is there a regular maintenance schedule for sensors? X <br /> 47 Is there an observation schedule for surface discharges of plant X <br /> effluent? <br /> 48 Are there leaks within the diked areas and plans for prompt X <br /> removal? <br /> 49 Are there any mobile or portable oil storage tanks without X <br /> containment? <br />