My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_XR0003110
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
K
>
KASSON
>
22888
>
2900 - Site Mitigation Program
>
PR0500128
>
ARCHIVED REPORTS_XR0003110
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/5/2020 6:15:14 PM
Creation date
2/5/2020 2:22:31 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0003110
RECORD_ID
PR0500128
PE
2960
FACILITY_ID
FA0017784
FACILITY_NAME
CHEVRON-BANTA TERMINAL
STREET_NUMBER
22888
STREET_NAME
KASSON
STREET_TYPE
RD
City
TRACY
Zip
95376
APN
23906019
CURRENT_STATUS
01
SITE_LOCATION
22888 KASSON RD
P_LOCATION
99
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
76
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Chevron Products Company 4 <br /> Chevron Terrtvnal 1001621,22888 Kasson Road,Banta CA February 28,2002 <br /> 24A and MW-28A exhibited some decrease in TPHd concentrations All wells except for <br /> MW-29A exhibited some decrease in MtBE concentrations <br /> Test wells TW-1 through TW-4 operated intermittently during this period Nearby wells in <br /> the area had measured dissolved oxygen levels from 5 38 mg/1 to 7 82 mg/l, however, UA- <br /> zone wells generally contained separate-phase hydrocarbons and had lower dissolved oxygen <br /> UPCOMING ACTIVITIES <br /> During the upconung reporting period, the following activities will be performed <br /> • Perform comprehensive inspection and troubleshooting of the intermittent ISO-GEN <br /> units TW-1 through TW-4 Each unit will be reactivated following troubleshooting and <br /> resolution of any operational problems <br /> • Conduct groundwater quality sampling each month for the duration of the ISO-GEN pilot <br /> study and analyze samples In accordance with the existing analytical schedule <br /> • Prepare a monthly status report for the next reporting period <br /> ISO-GEN system operation is scheduled to continue through March 2002 If you have any <br /> question regarding this status report, please contact Bob Jackson at (916) 861-0400 extension <br /> 283 or Scott Gable at extension 231 <br /> Sincerely, <br /> SECOR International Incorporated <br /> Bob W Jackson Jr <br /> Staff Geologist <br /> Scott Gable, RG 6366 <br /> Principal Geologist <br /> I IChevron110016211Penodic Momtormg\ISO-GEN MonthlyVan 02 I80GEN status report doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.