My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_XR0003111
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
K
>
KASSON
>
22888
>
2900 - Site Mitigation Program
>
PR0500128
>
ARCHIVED REPORTS_XR0003111
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/5/2020 7:45:35 PM
Creation date
2/5/2020 2:23:15 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0003111
RECORD_ID
PR0500128
PE
2960
FACILITY_ID
FA0017784
FACILITY_NAME
CHEVRON-BANTA TERMINAL
STREET_NUMBER
22888
STREET_NAME
KASSON
STREET_TYPE
RD
City
TRACY
Zip
95376
APN
23906019
CURRENT_STATUS
01
SITE_LOCATION
22888 KASSON RD
P_LOCATION
99
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
54
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
rl Chevron Products Company 4 <br /> Chevron Terrmnal 1001627 22888 Kasson Road Banta CA Januga 30 2002 <br /> Test wells TW-1 through TW-4 operated continuously during this period Nearby wells in <br /> the area had measured dissolved oxygen levels from 4 11 to 7 14 mg/L, however, UA—zone <br /> . wells generally contained separate-phase hydrocarbons and had lower dissolved oxygen <br /> UPCOMING ACTIVITIES <br /> During the upcoming reporting period, the following activities will be performed <br /> • Conduct groundwater quality sampling and routine inspections each month for the <br /> duration of the ISO-GEN pilot study and analyze samples in accordance with the existing <br /> analytical schedule <br /> • Prepare a monthly status report for the next reporting period <br /> ISO-Gen system operation is scheduled to continue through March 2002 If you have any <br /> question regarding this status report, please contact Greg McIver at (916) 861-0400 extension <br /> 279 <br /> Sincerely, <br /> SECOR International Incorporated <br /> Greg cIve <br /> Project Scien <br /> Scott Gable, RG 6366 <br /> Principal Geologist <br /> Attachments Table 1 -Field Parameters <br /> Table 2 - Groundwater Analytical Data <br /> Figure 1 - Site Location Map <br /> Figure 2—ISO-GEN Site Plan <br /> Attachment A— Site Investigation History <br /> Attachment B —Field and Laboratory Procedures <br /> Attachment C —Certified Analytical Results and Field Data Sheets <br /> cc Mr Bob Cochran, Chevron Products Company, San Ramon California <br /> Mr Michael Infurna, San Joaquin County Environmental Health Division <br /> Mr Steven Ghio, Chevron Products Company, Banta California <br /> Mr Don Lundlum, Chevron Products Company, San Ramon California <br /> Mr John Lambie, Environmental H2O, Milwaukee Oregon <br /> Mr Urmas Kelmser, Chevron Research and Technology Company, Richmond, CA <br /> 1\Chevron%10016211REPORTSUSO-GEN MonthlyllSOGEN status report3 doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.