Laserfiche WebLink
FIELD DATA SHEET <br /> TER SAI+SPL�FIELD gr- <br /> )ATA SHEET r ardz? •' "` `•'°' �E' ` 9i?L'+ �r;�' <br /> PROJECT No :r 1 �. C-y LOCATION C1rA ;C'` e i�A WEtL ID <br /> CLIENT/STATION No. FIELD TECHNICIAN- <br /> WELL INFORMATION CASING PAY <br /> Depth to Liquid Toe <br /> �.� ��.��= L DIAMETER LINEAR FT. $AMPLE TYPE <br /> _ <br /> Depth to water TO —TOC TOC 132 0.17 Groundwater . <br /> Total depth TOB- 6S--kTOC ❑ 3. 038_ ❑ duplicate <br /> Date. me (2400) A 4 1066 ❑ Extraction well <br /> ❑ .---- 0 <br /> I u. ❑ Trip blank <br /> probe Type ❑Oil/Watee interface ❑ 102 ❑ Field blank <br /> =ad ®Electronic Indicator 41 ❑ 6 1 _ ❑ Equipment blank <br /> I.D.I ❑Other, ❑ 6 -�- -- ❑ Other, <br /> I <br /> IT GA/Linw Number of 'Calculated <br /> TD �- DTW �_ !x Foot __ x Casins =Purge 1 C5 8-) <br /> DATE PURGED: 23-,7-3,99 <br /> 6.%OL- END(2400 hr) Bp'Z. PURGED BY: <br /> DATE SAMPLED: ?-2'3 START:- 5. p <br /> _END(2400 hr? '3 0 SAMPLED BY: <br /> TIME VOLUME PH E.0 TEMPERATURE <br /> 2400 hr i"al units (umhos/cm a 2 S'C1 COLOR TURBIDITY ODOR <br /> 0 yj J !:�50 t- <br /> Pumped dry Yes <br /> 1.bd..re r.rM <br /> repay L& wee <br /> FIELD MEASUREMENTS AT TIME OF SAMPLE.AFTER RECHARGE- <br /> DTW 11 J Z -TOB0 <br /> PURGING EaU1PMwT/i D.# SAMPLING EQU-II-PMENT/I.D.#E <br /> ❑ Bader ❑ Alrirft Pump. ® Baller— J)W . <br /> ❑ Centnfugaly,ump. C] Dedicated ❑ Dedicated. <br /> ® Other `` 'r'1 ❑ Other <br /> M{p� C L R DATE TIME(24001 No of Cont. SIZE CONTAINER PRESERVE 6NALYTICAL PARAMETER <br /> r I <br /> REMARKS <br /> PACOC <br /> L � FHrMCr�+rn•► <br /> SIGNATVRE r�vr Mr <br />