Laserfiche WebLink
MELD DATA SHEET <br /> PROJECT No ._��Z � LOCATION- WELL l0 # <br /> CLIENT/STATION No \DC)10'2'14 FIELD TECHNICIAN \j L/ Lx',1f1��01?G'ST <br /> WELL INFORMATION � CASING GA <br /> �r DIAMETER LINEAR FT SAMPLE <br /> Depth to Liquid TOB r— TOC �rTYPE <br /> Depth to water TOB TOC ❑ 2 017 IN Groundwater <br /> Total depth TOB N-M TOC ❑ 038 ❑ Duplicate <br /> Date -IN ZLS.98 Time(2400) -7.3-7 4 066 ❑ Extraction well <br /> ❑ 4 5 --- <br /> 08 _ ❑ Trip blank <br /> FTotx Type ❑OWWater interface ❑ 1 02 ❑ Field blank <br /> ' and 9 Electronic indicator ❑ 6 iA ❑ Equipment blank <br /> to ❑Other, ❑ 8 26 ❑ Other, <br /> t <br /> Gal/Linear Number of Calculated <br /> TD 1�.0 DTW �• =_� � 4 x Foot A.A. x Casings____`-Purge—L2.1 <br /> DATE PURGED. 5 ,Z�. 9B-START. 113o END(2400 hr) il3� PURGED BY: <br /> ' DATE SAMPLED. START 0.3*1_ END(2400 hr) I1• q_e SAMPLED BY: ! W <br /> TIME VOLUME pH EC. TEMPERATURE <br /> 2400 1,r (gam uncts (uml7os/cm @ 2 S°C) F) COLOR TURBIDITY ODOR <br /> �]1As— 1,2']tZ Ups_ G10 _ .mon F_4� <br /> 11 36 $ j 13L \ C>10 , C 6UA;kj Mon _ AVonJF <br /> ll•3L_ 1 'I 1�Q �_�_ L1 m0�— nc�nP <br /> c�.taloo rm.ra-too s....� <br /> Pumped dr? YesON <br /> r•eo.r u� w..• <br /> FIELD MEASUREMENTS AT TIME OF SAMPLE, AFTER RECHARGE T• <br /> DTT TOB/TOC <br /> PURGING EQUIPMEt T/I D N SAMPLING EQUIPMELffLI D # <br /> Q Bailer ❑ Aldtft Pump ffi Bailer 171SP <br /> ' ❑ Centr((ug�Pump ❑ Dedicated -- ❑ Dedicated <br /> Other )ZL Y14EC1_, ❑ Other <br /> ' AMP CKML R DATE TIME(2400) No of Cont SIZE CONTAINER PRESERVE ANALYTICAL PARAMETER <br /> Z <br /> 1 <br /> ' REMARKS <br /> c w4C <br /> [rr.nr(�r,rr( it•1 <br />