My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
FIELD DOCUMENTS_FILE 1
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
H
>
HUNTER
>
130
>
2900 - Site Mitigation Program
>
PR0505148
>
FIELD DOCUMENTS_FILE 1
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/5/2020 7:32:04 PM
Creation date
2/5/2020 2:44:06 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
FIELD DOCUMENTS
FileName_PostFix
FILE 1
RECORD_ID
PR0505148
PE
2950
FACILITY_ID
FA0003950
FACILITY_NAME
SJ COUNTY GARAGE
STREET_NUMBER
130
Direction
N
STREET_NAME
HUNTER
STREET_TYPE
ST
City
STOCKTON
Zip
95202
CURRENT_STATUS
02
SITE_LOCATION
130 N HUNTER ST
P_LOCATION
01
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
128
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Jun 2b U2 1U : 44a City , o£ StocktonPW - Permit ( 20919 %'7 - 0901 p . J <br /> Revocable Permit No . 02-15W <br /> Ramage Environmental <br /> Page 2 <br /> 4. In accordance with Section 1 (h) of the "Standard Conditions Applicable to <br /> Revocable Permits ," the permittee shall provide and keep in force during the term <br /> of the permit a policy of public liability insurance against liability for injuries to <br /> persons or property arising out of accidents attributable to the structure on City <br /> property, in amounts to be determined by the Risk Manager. The policy of <br /> insurance so provided shall contain a contractual liability endorsement covering the <br /> liability assumed by the Permittee by the terms of his permit and shall contain a <br /> provision that such policy may not be canceled except after thirty (30) days notice <br /> in writing to be given to the Risk Manager. The copies of these policies or <br /> certificates evidencing the same shall be filed with the Risk Manager of the City <br /> after approval of the City Attorney. <br /> 5 . The issuance of this permit by the City does not create any agency on the part of <br /> the permittee, and the permittee will hold the City of Stockton harmless for any <br /> action or damages arising out of the permittee's activities performed under this <br /> permit. <br /> 6 . Permittee, or his contractor, shall obtain an Encroachment Permit for the installation <br /> of the well(s). <br /> 7 . The well head(s) shall be covered with a meter box or valve box as approved by the <br /> City of Stockton . The top of the box shall be flush with the surrounding ground or <br /> pavement and shall be brought to any future grade adjustments by the permittee at <br /> their own cost. <br /> _ 8 . The provisions of the State of California , Department of Water Resources Bulletin <br /> 74-81 entitled "Water Well Standards: State of California" shall be applicable to this <br /> permit. <br /> 9 . The drilling location(s), method , and well design are to be approved by the California <br /> Department of Health Services and the Central Valley Regional Water Quality <br /> Control Board . <br /> 10 . Drilling operations that create loud noise shall be confined between the hours of 7 <br /> a. m. and 6 p. m. <br /> 11 . Portable mud tanks are to be used . <br /> 12 . Disposal of water from the well development shall be in accordance with current <br />
The URL can be used to link to this page
Your browser does not support the video tag.