My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_FOURTH QUARTER_ANNUAL 2008 GROUNDWATER MONITORING REPORT
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
K
>
KASSON
>
22888
>
2900 - Site Mitigation Program
>
PR0519076
>
ARCHIVED REPORTS_FOURTH QUARTER_ANNUAL 2008 GROUNDWATER MONITORING REPORT
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/5/2020 5:27:08 PM
Creation date
2/5/2020 3:36:04 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
ARCHIVED REPORTS
FileName_PostFix
FOURTH QUARTER_ANNUAL 2008 GROUNDWATER MONITORING REPORT
RECORD_ID
PR0519076
PE
2950
FACILITY_ID
FA0014276
FACILITY_NAME
CHEVRON BULK TERMINAL 100-1621 UST
STREET_NUMBER
22888
Direction
S
STREET_NAME
KASSON
STREET_TYPE
RD
City
BANTA
Zip
95304
APN
23906019
CURRENT_STATUS
02
SITE_LOCATION
22888 S KASSON RD
P_LOCATION
99
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
366
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
' Fourth Quarter/Annual <br /> 2008 Groundwater <br /> ' ARCADIS Monitoring Report <br /> Chevron Bulk Fuel Terminal <br /> 100-1621 <br /> 22888 Kasson Road <br /> Banta, California <br /> Bio-sparge technology has been proposed as a remedial action to reduce groundwater <br /> concentrations in the excavated area.An Implementation Report specifying <br /> construction and operation will be submitted to the RWCQB under separate. <br /> ' TPH•DRO Concentrations in pg/L <br /> Quarter MW34UA MW35UA <br /> ' Third Quarter 2004 490 97 <br /> Fourth Quarter 2004 500 86 <br /> First Quarter 2005 370 310 <br /> ' Second Quarter 2005 1,100 410 <br /> Third Quarter 2005 660 170 <br /> Fourth Quarter 2005 100 <50 <br /> ' First Quarter 2006 980 <50 <br /> Second Quarter 2006 1,300 230 <br /> Third Quarter 2006 460 120 <br /> ' Fourth Quarter 2006 580 52 <br /> First Quarter 2007 1,200 690 <br /> Second Quarter 2007 900 62 <br /> ' Third Quarter 2007 2,100 120 <br /> Fourth Quarter 2007 NS NS <br /> First Quarter 2008 1,700 210 <br /> ' Second Quarter 2008 NS NS <br /> Third Quarter 2008 580 61 <br /> Fourth Quarter 2008 NS NS <br /> ' Notes: <br /> 1. pg/L=microgram per liter,equivalent to part per billion(ppb) <br /> 2. NS=not sampled <br /> Evaluation of Groundwater Oxygenation System <br /> ' Operation of the groundwater oxygenation system was initiated on April 19, 2004.The <br /> groundwater oxygenation system consists of 65 oxygenation points(OW-1 through <br /> OW-65), arranged in four banks of 16 to 17 wells, connected by mechanical piping to a <br /> ' 5 horsepower(hp)rotary vane compressor capable of 41 standard cubic feet per <br /> minute(scfm)at 21 pounds per square inch (psi). Each groundwater oxygenation point <br /> is equipped with a flow gauge,gate valve and pressure gauge to control airflow and <br /> ' pressure. Locations of oxygenation points are shown on Figure 2. <br /> ' 11 of 17 <br />
The URL can be used to link to this page
Your browser does not support the video tag.