My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
K
>
KENNEFICK
>
0
>
2900 - Site Mitigation Program
>
PR0506482
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/5/2020 6:03:22 PM
Creation date
2/5/2020 4:11:38 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
WORK PLANS
RECORD_ID
PR0506482
PE
2950
FACILITY_ID
FA0007454
FACILITY_NAME
FOLSOM SOUTH CANAL PROJECT
STREET_NUMBER
0
STREET_NAME
KENNEFICK
STREET_TYPE
RD
City
COLLIERVILLE
Zip
94623
CURRENT_STATUS
01
SITE_LOCATION
KENNEFICK RD
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
48
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
'Assessor's Parcel No_-V, on-I50-I4 . . .u .., y • }� ,,,Tj . <br /> C <br /> PERMIT TO ENTER <br /> FOR GEOTECII IICAL SAWLING <br /> r FOR FOLSOM SOU'T'H CANAL CONNECTION PROJECT <br /> For a consideration of$500,permission is granted to East Bay Municipal Utility District CDistrict") <br /> for a period between December 1, I996 through March 31, 1997 to enter in,over,and upon owner's <br /> land to bore hole(s) and excavate test pit(s) in connection with.the District's Initial studv of the <br /> Folsom South Canal Connection Project. The location(s) of geotechnical test site(s) will be <br /> determined in consultation with the landowner(s). <br /> Geotechnical sampling will be either bore hole(s) or test pit(s)- The exploration hole(s) will be <br /> approximately 30-50 feet in depth. Test pits will be approximately eight(8)feet wide,20 feet long, <br /> and IS feet deep. Test pit(s)will be baclfil led. After sample collecting is complete,bore hole(s) <br /> will be bacUlled and sealed with grout Equipment to be used for the exploration includes a truck <br /> mounted drill rig,a water truck,backhoe and a pick-ap truck. <br /> The rights and privileges hereby granted to District may,at the option of the District,be exercised <br /> by any authorized agent or contractor of District, including CH2M hill, Olivia Chen Consultants, <br /> and Pitcher Drilling. <br /> District agrees upon the completion of any work hereunder to restore the surface of the ground as <br /> near as possible to the condition in which it was prior to the commencement of said work. <br /> It is understood and agreed that the District will leave the premises in a clean and orderly condition <br /> and will repair,replace,or compensate for any existing improvements that may have been disturbed <br /> or removed during the course of work. <br /> Project team members and the project consultant have been thoroughly instructed in proper field <br /> procedures and conduct_ 'Me following riles will be followed. <br /> • Property owners will be given at least 24 hours notice prior to entry by phone or mail. <br /> Gates will be Ie8 as they were found. <br /> • No pets or firearms will be permitted. <br /> All machinery and vehicles will be equipped with spark arrestors. <br /> All vehicles will be required to carry fire extinguishers and shovels. <br /> • Smoking is permitted only in enclosed vehicles. <br /> No trash or other evidence of field visits will be left on the property. <br /> • All field staff will carry identification and information regarding this project. <br /> • Vehicle speeds will be kept to five (5) miles per hour on unpaved roads in agricultural <br /> properties to miaimize dust. <br /> Owner is welcome to accompany or observe any of the crews working on their property at any time- <br /> M6-34-10 1 xz.. rtrou+95 <br />
The URL can be used to link to this page
Your browser does not support the video tag.