Laserfiche WebLink
• �� • GEOTECHNICAL <br /> NEIL O. ANDERSON j ENVIRONMENTAL <br /> A N D A S S O C I A T E S <br /> INSPECTIONS & TESTING <br /> LABORATORY SERVICES <br /> POOL ENGINEERING <br /> POST TENSION DESIGN <br /> August 8, 2005 <br /> NOA Project Number: LE03-034 <br /> Send via U.S. Mail and Fax (209) 464-0138 Aft, _ 920 <br /> 05 <br /> Mike Infurna ENVIRONNjSan f <br /> NrIYE <br /> 304 E.aWquin eber Avenuen3r'Floorntal Health Department PERM1TIS RV CESLrN <br /> Stockton, CA 95202 <br /> Re: Schedule for Work at Chinchiolo Stemilt California <br /> 4799 N. Jack Tone Road, Stockton, 95215 <br /> Dear Mike, <br /> As per our conversation last week, I am sending a tentative schedule for drilling-related activities <br /> at the subject site which will require your involvement. The scope of work and schedule is as <br /> follows: <br /> 1) Abandon MW-3. The work is scheduled for Thursday, August 25, 2005. <br /> See attached site plan for location of MW-3. A subcontractor to NOA, <br /> VW Drilling, is scheduled to perform work. <br /> 2) Drill two new soil borings: one to approximately 80 feet,the other to the <br /> aquifer about 110 ft. This work is to commence Monday, August 29, <br /> 2005. The work is expected to take two to three days. NOA will complete <br /> the drilling using our personnel and equipment. <br /> 3) Drill and Install MW-5 (replacing MW-3) located about 250 ft west of <br /> MW-3. This work will follow after the two soil borings are completed, <br /> hopefully September 1, 2005. NOA will complete the drilling using our <br /> personnel and equipment. <br /> LODI ■ SACRAMENTO ■ MODESTO <br /> ENVIRONMENTAL DIVISION 902 Industrial Way,Lodi,California 95240 ■209.367.3701 0 209.369.4228 fax ■w .noandersonxom <br />