Laserfiche WebLink
GEO-PHASE <br /> ENVIRONMENTAL <br /> t October 14, 2005 <br /> GPE Project No.:503.2 <br /> ' Mr. Gary Hanna <br /> Stockton Mortgage <br /> t 6820 Pacific Avenue <br /> Stockton, CA 95207 <br /> ' Re: Soil Boring Installation <br /> English Oaks Plaza,2625 Hutchins Street,Lodi CA <br /> (APN No.: 060-240-07) <br /> ' Dear Mr. Hanna: <br /> Geo-Phase Environmental Inc. is pleased to submit this Report documenting the <br /> 1 work completed to investigate environmental conditions associated with the above <br /> site (the "Property"). The scope of work comprised the following: <br /> ' . The installation of a machine-drilled soil boring to a total depth of 76 feet below <br /> ground surface. The collection of soil samples on four-foot intervals and the <br /> ' collection of a groundwater sample from the total depth of the boring. <br /> Analysis of the groundwater sample for Volatile Organic Compounds. <br /> We appreciate this opportunity to serve your environmental needs. <br /> Respectfully s bmitted, <br /> Geo-Phase Environmental Inc. <br /> t Stephen M. Lankford, RG/REA <br /> President <br /> Enclosures <br /> CC: Harjinder Hundal <br /> tHarlin Knoll, San Joaquin County EHD <br /> ' 2937 Veneman Ave.,#13240 Geo-Phase Environmental Inc. Phone (209) 569-0293 <br /> Modesto, CA 95356 Fax(209) 569-0295 <br />