My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SITE INFORMATION AND CORRESPONDENCE
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
K
>
KASSON
>
23500
>
2900 - Site Mitigation Program
>
PR0524672
>
SITE INFORMATION AND CORRESPONDENCE
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/6/2020 10:11:48 AM
Creation date
2/6/2020 8:31:50 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
SITE INFORMATION AND CORRESPONDENCE
RECORD_ID
PR0524672
PE
2965
FACILITY_ID
FA0016571
FACILITY_NAME
DEUEL VOCATIONAL INSTITUTE
STREET_NUMBER
23500
STREET_NAME
KASSON
STREET_TYPE
RD
City
TRACY
Zip
953049518
APN
23912001
CURRENT_STATUS
01
SITE_LOCATION
23500 KASSON RD
P_LOCATION
99
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
611
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
t <br /> DEPARTMENT OF CORRECTIONS -5- <br /> DEUEL VOCATIONAL INSTITUTION <br /> SAN JOAQUIN COUNTY <br /> CEASE AND DESIST ORDER NO. R5-2005-0152 <br /> 3. The Discharger shall comply with the following time schedule to assure compliance with Effluent <br /> Limitation C.1. of Order No. R5-2-003-0065 for Outfall 004: <br /> Task Compliance Date <br /> 1. Submit Method of Compliance Work Plan Schedule. 1 March 2006 <br /> 2. Demonstrate full compliance with Effluent Limitation C.1. 1 March 2008 <br /> 3. Progress Report. 1 March and <br /> 1 September each year <br /> The progress reports shall detail what steps have been implemented towards achieving compliance with <br /> waste discharge requirements,including studies,construction progress,evaluation of measures <br /> implemented,and recommendations for additional measures as necessary to achieve full compliance by <br /> the final date. <br /> 4. The Discharger shall submit to the Regional Board on or before each compliance report due date, <br /> the specified document or, if appropriate, a written report detailing compliance or noncompliance <br /> with the specific schedule date and task. If noncompliance is being reported,the reasons for such <br /> noncompliance shall be stated, plus an estimate of the date when the Discharger will be in <br /> compliance. The Discharger shall notify the Regional Board by letter when it returns to <br /> compliance with the time schedule. <br /> 5. If, in the opinion of the Executive Officer,the Discharger fails to comply with the provisions of <br /> this Order,the Executive Officer may apply to the Attorney General for judicial enforcement. <br /> I, THOMAS R. PINKOS, Executive Officer, do hereby certify the foregoing is a full, true, and correct <br /> copy of an Order adopted by the California Regional Water Quality Control Board, Central Valley <br /> Region, on 21 October 2005. <br /> ✓� Q cro <br /> THOMAS R. PINKOS, Executive Officer <br />
The URL can be used to link to this page
Your browser does not support the video tag.