Laserfiche WebLink
' Revised Work Plan for Pilot Study 3 9.March 2011 <br /> Deuel Vocational Institution Burn Pit <br /> tTracy, San Joaquin County <br /> ' years. Monitoring of MW-24BP and MW-25BP should be conducted semi- <br /> annually until a revised Monitoring and Reporting Program Order is issued for the <br /> Site. <br /> 6. URS is proposing to abandon and seal the direct push injection points with a <br /> ' bentonite slurry due to the possibility that the pH of grout may affect the <br /> population of microoganisms generated during the Pilot Study. Please verify this <br /> is in compliance with San Joaquin County Environmental Management <br /> Department abandonment procedures. <br /> 7. URS has also submitted on your behalf, a Work Plan (dated 18 November 2010). <br /> 1 for abandonment and replacement of well MW-23SP, which was inadvertently <br /> destroyed by Department of Corrections maintenance employees. I concur with <br /> the Work Plan as proposed, provided all work is conducted in accordance with <br /> San Joaquin County Environmental Health Department. <br /> 8. Please provide an estimated schedule for implementation of the Pilot Study, <br /> including a proposed schedule for submitting a Results Report. <br /> If you have any questions please contact me at kamaru(cDwaterboards.ca.00v or <br /> ' (916) 464-4607. <br /> KATHLEEN AMARU, P.G., C.E.G. <br /> ' Engineering Geologist <br /> cc: Mr. Gregor Larabee, Department of Corrections <br /> Mr. Jeremiah, Department of Corrections <br /> Mr. Conrad Lewis, Department of General Services-Real Estate Services <br /> Division <br /> ' Mr. Don Wilcoxen, Deuel Vocational Institution <br /> Ms. Lori Duncan, San Joaquin County Environmental Management Department <br /> Mr. Vern Elarth, URS Corporation <br /> ' California Environmental Protection Agency <br /> ZA'Recycled Paper <br />