Laserfiche WebLink
Ms. Kathy Amaru Page 3 of 4 <br /> Regional Water Quality Control Board-Central Valley Region <br /> November 18, 2010 <br /> the well screen. Eight inches of#0/30 transition sand will be installed above the filter pack of each well. <br /> A one-foot bentonite seat will be placed above each sand pack, and neat cement will be used to seal the <br /> remaining annular space to the surface. The well will be completed with a 3-foot stove-pipe monument <br /> and traffic ballards. Soil cuttings will be logged by a URS geologist in accordance with the Unified Soil <br /> Classification System.No soil samples will be collected for laboratory analysis. <br /> WELL DEVELOPMENT <br /> The new monitoring well will be developed using a 1.5-inch OD hand bailer by continuously surging <br /> over the entire screened interval for 10 minutes. Well development will be completed by purging a <br /> maximum of 10 well casing volumes or until stabilization of water parameters(i.e. conductivity and pH). <br /> WASTE DISPOSAL <br /> 1 Soil cuttings and wastewater generated during the drilling and development activities will be placed in <br /> 55-gallon DOT-approved steel drums, pending disposal. The waste drums will be transported to an <br /> approved facility for disposal. <br /> ! REPORT PREPARATION <br /> Following completion of the field activities, a report will be prepared documenting the activities. <br /> G:\STATE-COUNTY-CITY\STATE\Calif-DGS\Calif-DGS-RESD\UST PROJECT FILES0VIV3urn Pit\06-Delivemblest20101 I I8 MW-23 <br /> Abadonment&Replacement Workplan120101118 DVI Bum Pit Well Destruction and Reinstallation Workplan.doc <br />