My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SITE INFORMATION AND CORRESPONDENCE
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
K
>
KASSON
>
23500
>
2900 - Site Mitigation Program
>
PR0524672
>
SITE INFORMATION AND CORRESPONDENCE
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/6/2020 10:11:48 AM
Creation date
2/6/2020 8:31:50 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
SITE INFORMATION AND CORRESPONDENCE
RECORD_ID
PR0524672
PE
2965
FACILITY_ID
FA0016571
FACILITY_NAME
DEUEL VOCATIONAL INSTITUTE
STREET_NUMBER
23500
STREET_NAME
KASSON
STREET_TYPE
RD
City
TRACY
Zip
953049518
APN
23912001
CURRENT_STATUS
01
SITE_LOCATION
23500 KASSON RD
P_LOCATION
99
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
611
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
URS <br /> ' Ms. Kathy Amaru Page 5 of 6 <br /> Regional Water Quality Control Board—Central Valley Region <br /> May 8,2011 <br /> ' All other analytes were reported at less than laboratory detection limits. Groundwater monitoring <br /> analytical data are summarized in Table 2,Table 3, and presented on Figure 3. Groundwater monitoring <br /> well field sampling data sheets are provided in Attachment A. The laboratory analytical data report and <br /> chain-of-custody documentation are provided in Attachment B. Groundwater analytical data were <br /> submitted electronically to the State Water Resources Control Board GeoTracker System per Article 12, <br /> Chapter 17,Division 3,Title 23 of the California Code of Regulations. Geotracker upload confirmation <br /> sheets are included as Attachment C. The site was also surveyed on May 2, 2011. A copy of the survey <br /> report is included as Attachment D. <br /> CONCLUSIONS <br /> tBased on the results of groundwater monitoring activities,URS concludes the following: <br /> ' • The direction of groundwater flow beneath the site was to the northwest with a gradient of 0.0016 <br /> feet per foot(ft/ft). <br /> ' • The results of the pilot test to date have been very promising, indicating chlorinated ethenes are <br /> being destroyed by the anaerobic bacteria in the treatment area,while concentrations of secondary <br /> water quality parameters have remained close to baseline levels in transition and compliance wells. <br /> RECOMMENDATIONS <br /> • Continue sampling the six on-site monitoring wells quarterly to assess pilot test. <br /> 1 <br /> H'.\Wpmceus SD\DVI-Bum Pit@0110 -BPdQMRl l Report.doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.